Building an Enduring Practice While the Enterprise Is Changing

SNC

Executive Summary

SNC began exploring Technology Business Management (TBM) as it sought greater transparency into technology spending, more scalable financial management, and stronger connections between technology cost and the products, services, and outcomes that spending supported. After a limited pilot in 2024, SNC conducted a broader assessment, developed a roadmap, selected an enabling platform, and entered implementation in late 2025 with two initial use cases: IT Financial Management (ITFM) and Product Total Cost of Ownership (TCO). The investment was also subject to a mandate from SNC’s President to demonstrate positive ROI in its first year to justify continued funding.

The adoption became more than a technology implementation. SNC had to establish the TBM Practice while developing its model and use cases, building internal TBM knowledge, governance, change management, data stewardship, service ownership, and value-realization mechanisms as the work progressed. At the same time, organizational restructuring and changes to SNC’s operating model altered some of the assumptions behind the original roadmap. SNC adapted its priorities and methods rather than treating the roadmap as fixed.

The initial use cases consequently developed along different trajectories. ITFM became a recurring operating process and improved technology-cost transparency, although manual processes and limited stakeholder self-service remained. Product TCO exposed important data, organizational, planning, and analytical dependencies but had not become a repeatable capability by the close of the research period. SNC also established a more disciplined process for identifying and validating savings; by late August 2026, TBM leader Alan Baker reported that SNC was on track to reach approximately $1.2 million in hard savings, while cautioning against attributing every dollar directly to TBM.

SNC’s experience demonstrates that TBM adoption is not completed simply by implementing a model, platform, or initial set of use cases. The more consequential transition is from an adoption effort to an enduring organizational capability: one able to operate what has been established, learn from incomplete outcomes, adapt to changing conditions, develop new use cases, and continue maturing the Practice over time.

Table of Contents

Introduction

SNC operates in an environment where technology is inseparable from mission execution. As the organization has grown and supported an increasingly diverse portfolio of aerospace and defense programs, the demands placed on technology have expanded not only in scale but in complexity. Technology is also highly distributed across SNC, with costs and responsibilities spanning IT, Integrated Program Management (IPM), engineering environments, enterprise platforms, applications, infrastructure, and program-specific solutions. That distribution reflects how the business operates, but it can make enterprise questions about technology cost and value difficult to answer consistently.

Those questions had been developing for years before SNC formally began adopting Technology Business Management. Leaders wanted greater clarity into where technology money was being spent, what the organization received for that spending, and how financial information could better support planning and investment decisions. Existing financial-management practices could account for technology spending, but producing different views of that information often required substantial manual effort and interpretation. As SNC grew and the questions became more sophisticated, the limitations of those approaches became increasingly apparent.

TBM offered SNC a structured way to address that problem. Rather than developing another organization-specific method for categorizing and reporting technology costs, SNC could use an established framework, common terminology, and a community of practitioners confronting similar questions. The immediate goals were practical: improve technology-cost transparency, strengthen IT financial management, develop more consistent views of total cost, and begin connecting technology spending to the products and services it supported. Longer-term ambitions extended toward more sophisticated questions about technology value, investment decisions, and unit economics.

The adoption did not begin with a full enterprise implementation. SNC first experimented with TBM on a limited scale, then used what it learned to conduct a broader assessment and develop a roadmap. By the time the implementation documented in this case study began in late 2025, SNC had already spent approximately a year testing the concept, building support, evaluating its environment, and deciding how to proceed.

That history is important because many of the choices SNC made during implementation were rooted in what it had already learned. It also provides the baseline against which subsequent changes can be understood. This case follows that progression: the decisions SNC made, the reasons behind them, what happened when those decisions encountered operational reality, and how the TBM Practice and its initial use cases evolved in response.

Background: The Conditions That Led SNC to TBM

SNC did not arrive at TBM because of a single event or failed financial process. The decision developed from the intersection of organizational growth, a distributed technology environment, increasing scrutiny of technology spending, and a desire to connect cost more directly to the value technology enabled. SNC’s CFO and COO called for greater accountability for the value of technology spending. Dawn Jacobs, Vice President of Integrated Program Management, and Rob Giannetta, Senior Vice President of IT, formed a partnership to address that expectation and became the executive co-sponsors for TBM.

Mrs. Jacobs approached the challenge from a business and financial perspective. Technology was essential to SNC’s operations, but understanding its economic value required collaboration across organizational boundaries. She recognized that the organization needed to connect technology spending with business priorities and outcomes, rather than evaluate costs in isolation. Her partnership with Mr. Giannetta reflected an important principle of SNC’s adoption: TBM would need to bring technology and financial perspectives together rather than operate exclusively within either domain.

Mr. Giannetta brought the technology perspective, with growth and scalability among his central concerns. SNC had expanded substantially over the preceding several years and expected that growth to continue. At the same time, its technology delivery model was highly distributed rather than neatly centralized within one IT organization. For Mr. Giannetta, understanding how much SNC was spending on technology as an enterprise, where that money was going, and what the organization received in return was part of determining how the company could scale responsibly. He framed the opportunity in practical terms: greater clarity could help SNC identify where it could optimize technology spending, obtain greater value for the same spending, or both.

Maturing IT Financial Management—and Its Limits

SNC was not starting without financial-management discipline. Before TBM, teams were already budgeting, forecasting, reconciling actuals, managing contracts, preparing reports, and supporting financial decisions. Over time, IT Financial Management had introduced more structure and cadence into those activities.

The difficulty was that many processes remained dependent on Excel, Power BI, manual consolidation, and knowledge held by the people performing the work. These methods could produce useful information, but they became more cumbersome as SNC grew and leaders requested different views of the same underlying costs. The small technology finance team faced increasing demand: producing a report was one task, while answering the next question could require returning to the data, reorganizing it, and explaining how one view related to another.

SNC also faced a structural problem that better reporting alone could not solve. Technology information came from systems designed for different purposes. Financial data, labor information, vendor records, assets, projects, infrastructure, and operational data could each be accurate within their source environments without being easy to relate to one another. SNC could trust much of the underlying information and still struggle to correlate it consistently across systems.

Definitions added another layer of complexity. A conversation about the “total cost” of a technology could mean its current fully burdened cost, its lifecycle cost, or some combination of infrastructure, application, labor, vendor, and program expenses depending on who was asking the question. SNC could answer many individual cost questions, but it lacked a common structure through which those answers could be consistently related.

This mattered because expectations for financial insight were also changing. Leaders were interested not only in retrospective reporting but in planning, prioritization, optimization, and eventually the relationship between technology cost and business value. Variable cloud spending and emerging AI investments added new examples of costs that did not fit comfortably into older management assumptions. Growth made scalability more important, while increasing technology investment made defensible financial decisions more consequential.

Against that background, TBM appealed to SNC as more than a different reporting format. Mr. Baker described the methodology as mature and credible across industries, with a community that allowed SNC to draw on experience beyond its own organization. Instead of creating another proprietary classification approach, SNC could use a common taxonomy and management framework and then connect that structure to the way its own business operated.

SNC was trying to extend financial practices that already worked in important respects while addressing problems those practices were becoming less able to handle efficiently or consistently.

Starting Small: The 2024 TBM Pilot

SNC’s formal TBM journey began in December 2024 with a small pilot funded by Mrs. Jacobs centered on technology spending within Integrated Program Management. The team used the pilot to explore how TBM could help it understand technology cost and Total Cost of Ownership within a bounded part of the organization.

Starting with a pilot allowed SNC to test the concepts before committing to a larger implementation. Mrs. Jacobs later characterized the approach as an opportunity to “start small” and learn before making a larger bet. The pilot produced enough useful evidence for SNC to continue, but its value also came from showing where the boundaries of the experiment were too narrow.

IPM did not operate an isolated technology environment. Technologies and costs crossed between IPM and IT, which meant that understanding only the IPM portion could not provide the holistic view SNC ultimately wanted. Bringing the two organizations together around a defined plan for technology-spend visibility became one of the important milestones in the journey. The pilot demonstrated that TBM could be useful; it also demonstrated that a broader implementation would require organizational participation beyond the group where the experiment began.

That realization shifted the question from whether SNC could apply TBM to a limited set of technology costs toward what would be required to use TBM more broadly across the enterprise.

From Pilot to Assessment and Roadmap

During 2025, SNC began preparing for that broader effort. The organization decided to conduct a more comprehensive assessment of its current state and develop a future-state roadmap rather than simply extending the pilot configuration.

SNC selected an experienced external TBM implementation partner to support this work. The reason for seeking an external partner was straightforward: SNC did not yet know how to perform a TBM adoption itself and wanted expertise from the established partner ecosystem. The assessment began in earnest during the summer and involved stakeholders from across SNC. Rather than immediately trying to engage the entire enterprise, the team intentionally limited participation to organizations that could provide the perspectives needed to understand the environment without making the assessment unnecessarily broad.

The work examined SNC’s current state, future-state needs, and the path between them. The partner team also became familiar with SNC’s data and working structure during the assessment, knowledge that carried into implementation. The assessment and subsequent readout proved eye-opening for participants. By approximately September, the assessment had produced a future-state architecture and roadmap that SNC could use to make a larger investment decision.

The roadmap did not itself authorize implementation. SNC still needed executive support, funding, technology agreements, and an executable internal plan. The pilot and assessment gave Mr. Giannetta and Mrs. Jacobs a basis for seeking the larger investment, and SNC’s CFO and COO approved funding. That approval carried a consequential expectation from SNC’s President: the TBM investment needed to produce a positive return in its first year to earn continued support for a second year. The initial framework included approximately $300,000 in savings deliverables. By late 2025, SNC had secured the support and resources to move from planning into implementation, with financial value realization part of the mandate from the outset.

Continuing with the implementation partner preserved knowledge gained during the assessment. The partner team entered implementation already familiar with SNC’s stakeholders, data environment, and intended future state. The partner team provided project leadership, strategic TBM and ITFM expertise, and executive-level support from the partner side. It helped configure the environment, ingest and map data, develop the model and reports, and organize the work around SNC’s initial use cases.

SNC nevertheless entered the relationship with an important internal capability gap. Its core team brought relevant expertise in finance, technology, program management, and the business, but participants acknowledged that they had little experience operating an established TBM Practice. At the December 2025 baseline, the core team consisted of roughly six people, many only partially allocated to TBM. External expertise could accelerate the implementation and provide experience SNC did not possess, but SNC would still have to learn how to sustain the capability itself.

Choosing the Technology Platform

The decision to use a TBM platform followed a similar progression from experimentation to broader commitment. SNC had already tested the platform during the pilot, giving the organization direct experience before making its larger investment decision.

Several considerations supported the choice. Participants cited an established track record with TBM and the successful pilot, while emerging AI roadmaps were attractive to an organization already investing heavily into how emerging technologies will radically transform their industry. SNC also intended to implement capabilities for costing and planning that aligned with the immediate financial-management objectives it had established.

For SNC, however, product functionality was only part of the decision. Its position in the government market imposed security requirements that materially limited which technologies it could deploy. FedRAMP certification or equivalent was therefore an important selection criterion rather than a secondary preference. A product that appeared functionally attractive but could not satisfy SNC’s operating requirements would not have been a practical alternative.

Taken together, these considerations gave SNC reasonable confidence in the platform at the beginning of implementation. It had tested the technology, selected a product with an established TBM history, identified capabilities aligned with its initial use cases, considered the vendor’s future roadmap, and confirmed that the platform could operate within constraints that narrowed its choices.

The selection decision reflected the requirements and evidence SNC had at the time. Operational use would provide a second test: whether the platform could support the specific financial and analytical workflows SNC expected it to replace or improve, along with the AI capabilities to scale it.

Defining the Initial Adoption Agenda

By December 2025, SNC described itself as being at the very beginning of implementation even though its TBM journey had already been underway for approximately a year. The organization had completed the pilot and assessment, secured executive support, selected its technology, engaged an implementation partner, and developed a roadmap. It now had to turn those decisions into operating capability.

The near-term agenda centered on two major use cases. The first was IT Financial Management (ITFM). SNC wanted to migrate existing ITFM processes from Excel and Power BI into the platform’s ITFM planning and costing capabilities to improve maturity around reporting and workflows, integrate the 2026 budget, and establish more scalable planning and costing practices. The timetable was aggressive: early discussions contemplated major progress within approximately the first four months of implementation.

The second was Product/Service Total Cost of Ownership (TCO). SNC wanted greater visibility into the fully burdened cost of the products and services technology supported and, over time, a more complete understanding of lifecycle economics. The exact analytical object was not yet completely settled. Early conversations moved among applications, vendors, products, and services, while SNC itself recognized that it was sometimes using “TCO” broadly to describe both current fully burdened cost and full lifecycle cost.

The two use cases shared a common TBM foundation, but they did not begin from the same place. ITFM sought to improve and migrate financial-management processes that SNC already performed. Product TCO asked the organization to establish a new analytical capability whose organizational and data requirements were still being discovered. That difference would become increasingly important as implementation progressed.

SNC also had ambitions beyond those initial objectives. Participants discussed future possibilities including showback and chargeback, unit-cost economics, closer connections with other technology-management disciplines, and improved understanding of the value generated by technology investments. Those ideas established a direction rather than an immediate implementation commitment. The work in front of the team was already substantial: build the TBM Model, improve IT financial management, develop an initial TCO capability, and establish enough organizational capacity to operate what it was building.

Implementation therefore began with considerable momentum but also with important unanswered questions. The pilot had provided evidence to continue, the assessment had produced a roadmap, executive sponsors from complementary technology and business-financial perspectives were engaged, and the selected partner and platform appeared well matched to the immediate requirements. The next phase would test those choices in combination—and reveal that turning them into a functioning TBM Practice required more than configuring technology and loading data.

Building the Practice While Delivering the Work

When implementation began, SNC had an assessment, a roadmap, an implementation partner, a technology platform, executive sponsorship, and two initial use cases. What it did not yet have was an established TBM Practice capable of sustaining those things.

That became clearer during the first several months of 2026. The implementation partner could help SNC configure the platform, ingest data, map the TBM Taxonomy, and build the initial use cases, but the implementation also depended on work that SNC itself would have to perform. People had to make decisions about data and mappings, establish governance, define responsibilities, engage stakeholders, learn TBM, develop operating procedures, and determine how the capability would function after the initial implementation engagement ended. Much of that work involved choices about how SNC itself would operate and therefore could not simply be handed to an implementation partner.

In January, the technical work was still taking shape. The partner team had extracts of financial data from the ERP environment and operational data from the IT Service Management system and was working to bring those sources into the TBM platform and map them to the TBM Taxonomy. Automated ingestion had not yet begun. SNC expected eventually to serve certified datasets from its enterprise data warehouse, but the initial process relied on extracting and reviewing information before loading it into the platform. The approach allowed implementation to proceed while the longer-term data pipeline was being developed.

This early work made the correlation problem identified before implementation more concrete. One example involved traceability between general-ledger and supply-chain data. Similar issues appeared in mapping charge codes, labor, organizational structures, vendors, and other information into a model intended to explain technology economics rather than simply reproduce source-system reporting.

By March, the team was mapping expenses, including labor, to towers and subtowers and validating budget data loaded into the planning environment against its existing reports. The work was beginning to make the model tangible to people who had spent the preceding months discussing architecture, taxonomy, data extracts, and future capabilities. It also demonstrated why loading data and establishing a reliable TBM capability were not the same task. The team had to determine how source information should be interpreted, who could validate those interpretations, and how mappings would remain reliable as the underlying organization changed.

The TBM Practice was therefore developing alongside the model. SNC began identifying Practice roles, sending team members through the TBM Council’s TBM Practitioner Course and Certification, working through governance questions, and considering what would happen when the initial implementation phase ended. In February, Mr. Baker observed that the group was effectively functioning as a TBM office even though SNC was not formally describing it that way. Team members were beginning to occupy recognizable responsibilities around Practice leadership, analysis, modeling and administration, financial management, change, and related disciplines.

The TBM Practitioner Course and Certification became one mechanism for developing the internal knowledge needed to assume those responsibilities. Its value was not limited to introducing TBM terminology. A key observation early in the implementation was that people who had completed the course were beginning to recognize capabilities the developing Practice still needed and to ask questions about governance, organizational structure, and how TBM would operate after implementation. That created pressure to address work SNC had not yet completed, but it also gave a growing group of participants enough grounding in TBM to help shape what the Practice would become.

That knowledge translated into the work itself. Participants found the course particularly useful after gaining some practical exposure to the implementation. The experience gave concepts such as towers, cost pools, personas, and Practice responsibilities an immediate context, while the formal instruction helped them understand how those pieces fit together. Participants described referring back to the training while SNC mapped its cost centers to TBM towers and while the team worked through roles and responsibilities, as well as applying the training to categorizing costs and refining mappings. Rather than separating education from implementation, SNC was learning through an interaction between the two: implementation gave the course material context, and the course gave participants a framework for interpreting and acting on what they encountered.

That interaction did not eliminate the difficulty of moving from knowledge to practice. Moving from “theory to practice” remained a recurring challenge: understanding TBM concepts did not by itself determine how they should work within SNC’s organization, data, products, and operating environment. The TBM Practitioner Course and Certification strengthened the team’s common foundation, while SNC’s implementation experience forced participants to translate that foundation into organization-specific decisions. Much of that learning therefore occurred while implementation was underway rather than before it.

The limits of the original implementation scope became particularly visible as the first phase approached completion. The implementation partner provided expertise SNC did not possess, while SNC increasingly recognized organizational responsibilities that extended beyond the contracted implementation work. Some of those responsibilities became apparent only shortly before the organization needed to address them, creating challenges for internal planning and capacity. Mr. Baker reached a similar conclusion after seeing the breadth of capability reflected in the TBM maturity assessment. The implementation plan could be appropriately scoped for the contracted technical work and still not contain everything SNC needed to establish a sustainable TBM Practice.

SNC was learning that it could not simply complete an implementation and then operate what had been delivered. It had to develop its own ability to govern, interpret, communicate, improve, and extend TBM while the initial use cases were still being built.

Governance Developed as the Need for It Became Concrete

Formal TBM governance did not precede the implementation. At the December baseline, SNC had executive sponsorship and project management but had not yet established a complete TBM governance structure. Governance developed progressively as the team encountered decisions that required clearer ownership and as the future operating model came into view.

By February, a steering committee had become an explicit recommendation, and the team was preparing to discuss its composition with the executive co-sponsors. In March, participants still described the formal structure as unfinished. By April, SNC had established the steering committee and was finalizing its mandate, while a broader TBM charter remained in iterative development.

Those dates matter because they show governance developing in response to the work rather than appearing as a completed prerequisite. Early in implementation, many decisions could be handled within the core team or escalated through the project structure. As the model became more consequential and the number of affected stakeholders increased, SNC needed mechanisms for determining direction, resolving questions, and maintaining accountability beyond the people configuring the solution.

The governance model was also being developed while SNC’s wider organizational structure was changing. That made it difficult to write a charter once and regard it as finished. Mr. Baker described parts of the TBM charter as enduring while acknowledging that other elements depended on decisions about where the Practice was headed. SNC therefore allowed portions of its governance model to remain iterative rather than locking them to organizational assumptions that were already moving.

Executive sponsorship provided continuity while those structures matured. Mr. Giannetta and Mrs. Jacobs remained available for decisions that exceeded the developing Practice’s authority, giving the team an escalation path until the more formal governance mechanisms were established.

Organizational Change Management Arrived After Implementation Had Begun

SNC understood from the beginning that TBM would require organizational change, and the organization already had an enterprise change-management methodology based on Prosci. In practice, however, dedicated Organizational Change Management did not develop at the same pace as the technical implementation.

By early January, SNC’s change-management lead was becoming actively involved and developing an OCM plan tied to the implementation timeline. SNC participants acknowledged at the time that this work ideally would have started earlier. They said the plan should have been underway in December and described the preferred approach as involving OCM during planning and kickoff. The delay reflected practical circumstances rather than a decision that change management was unnecessary: the holiday period, purchase-order and executive-approval timing, and the availability of a small OCM function all affected when dedicated support could engage.

The consequences were initially limited because the population directly affected by TBM was still relatively small. During the first months, much of the work involved the core implementation team and subject-matter experts needed to provide or validate data. But the need for structured change support increased as the team began asking people outside that core group to participate. Cost-center and tower mappings needed validation. Directors and budget owners needed to understand what TBM was and why SNC was introducing it. Future users would eventually have to trust the information enough to incorporate it into their own work.

The preliminary plan used the ADKAR methodology and connected change activities to implementation milestones and stakeholder impacts. The team worked on personas, message mapping, resistance planning, and the sequencing of engagement. The change-management lead was particularly concerned about organizational change fatigue and about what participants called the “what’s in it for me” problem: people were less likely to adopt a new concept simply because they were told it was strategically important if they could not see how it affected their own responsibilities. The emerging approach therefore emphasized demonstrating value through the initial use cases and tailoring messages to the people being asked to change.

By April, that work had moved beyond planning. SNC had introduced TBM at an IT all-hands meeting and conducted a more focused session for directors and budget owners. Core users were receiving training, and the team was considering broader direct access to the platform as persona and security decisions were resolved. These activities increased awareness, but the people building and validating TBM were still considerably closer to the capability than many of the eventual consumers of its information.

As change management became more involved, it moved closer to the operating work rather than functioning as an activity added around the implementation. In retrospect, earlier involvement was one of the changes SNC would have made: greater visibility into the roadmap and the people affected by it would have allowed OCM to anticipate needs sooner rather than learning parts of the adoption while implementation was already moving.

SNC’s experience was therefore not a simple contrast between “having” and “not having” change management. The organization had a methodology, an experienced change-management function, a designated lead, an OCM plan, communications, training, and stakeholder activities. The more instructive issue was timing. Technical implementation could begin with a relatively concentrated group, while the organizational work required to turn the resulting capability into something other people understood and used developed later. The effect of that gap became more visible when SNC began evaluating whether stakeholders were actually consuming the information TBM produced.

Using Maturity Assessment to Manage the Adoption

SNC’s maturity assessment gave the team a way to examine whether the organizational capabilities needed to sustain TBM were developing alongside the technical implementation.

SNC conducted its first formal assessment early in its formal adoption. The assessment examined the organization across the TBM Foundations rather than evaluating only whether the model or technology had been implemented. It complemented the TBM Practitioner Course and Certification in an important way. Formal education was giving a growing group of SNC participants a common understanding of TBM and the elements required to operate it; the assessment gave the organization a structured way to examine how much of that capability it had actually established and where further development was required.

The first assessment proved “eye opening.” It showed both the range of capabilities SNC could ultimately develop and how much work remained between its current state and its ambitions. The executive sponsors reached a similar conclusion, describing the team’s aspirations as larger than its experience at that point. The assessment also reinforced another realization: although the implementation partner was successfully guiding the contracted implementation, SNC still had substantial internal work to perform and did not yet have deep experience determining what a mature TBM Practice required.

SNC used the assessment as a planning instrument. Rather than treating identified gaps as deficiencies to document and revisit later, the team began translating them into work. A recommendation to establish a steering committee contributed to governance activity already taking shape; by April, the committee had been established and its mandate was being finalized. Other capability-development needs identified through the assessment were being incorporated into the backlog SNC intended to use as it moved toward an enduring Lean-Agile shared-service model.

SNC repeated the assessment in June. The purpose was not simply to demonstrate that its scores had increased. A repeated assessment gave the team an opportunity to compare the organization against its earlier state, test whether the changes made during implementation were producing broader capability, and identify where development still lagged. By August, Mr. Baker said the assessments accurately represented SNC’s overall progression and described them as useful for shaping the roadmap and determining where further investment was needed.

The assessment also helped SNC avoid equating progress in one part of TBM with maturity of the whole Practice. During the period between assessments, SNC had made substantial progress establishing data pipelines, configuring technology, validating financial information, and developing governance. Other areas—including repeatable methods, organizational consumption, and some elements of operating practice—continued to require development. Looking across the Foundations gave the team a way to see those differences without assuming that implementation progress meant every organizational capability had advanced at the same rate.

For adopters, the important feature of SNC’s experience is therefore not its numerical maturity scores. More transferable is how the organization used the assessment: establish a baseline, expose work that an implementation plan alone did not necessarily reveal, translate identified gaps into action, reassess after meaningful development had occurred, and use the new view to shape subsequent priorities.

Maturity assessment thus became part of SNC’s management system for the adoption rather than a certification exercise. It helped the team ask a question that technical milestones alone could not answer: Are we developing the organizational capabilities required to operate TBM, not merely completing the implementation activities required to build it?

The Definition of Value Became More Demanding

SNC entered implementation with broad expectations for TBM value. Better transparency, more scalable financial management, improved planning, Total Cost of Ownership, and stronger technology investment decisions all formed part of the rationale. Alongside those goals, SNC’s President had required the investment to demonstrate positive ROI in its first year to justify a second year. The initial savings framework contemplated approximately $300,000 in deliverables. This financial requirement existed from the beginning; what changed during implementation was the size and specificity of the savings target.

By February, the quantified savings expectation had become more demanding: approximately $300,000 per quarter, equivalent to $1.2 million over four quarters, rather than the initial approximately $300,000 savings expectation. Mr. Baker described the message from executive sponsor Mrs. Jacobs as increasingly explicit: SNC needed “hard savings,” and those savings needed to be delivered rather than merely identified. The higher quarterly target sharpened the original first-year ROI mandate; it did not introduce that mandate.

The higher target also forced the team to become more precise about what it meant by savings. Participants distinguished two possible sources of benefit. One was efficiency created by the new capability itself: reducing manual processing, consolidating information, or eliminating work required by fragmented tools and processes. The other was savings discovered through the transparency TBM provided, such as identifying unnecessary, duplicative, or optimizable spending. Both could create value, but they represented different mechanisms and required different evidence.

An even more important distinction emerged between identifying an opportunity and realizing it. A model might show that spending could be reduced, but the potential saving did not become a financial result merely because someone had identified it. An owner had to take an action, the action had to affect actual spending, and the effect had to be validated. Mr. Baker compared the difference to a fundraising pledge versus cash received: the opportunity could be recorded, but it did not count as realized savings until the financial effect occurred.

This shifted part of SNC’s TBM work from producing insight toward governing what happened after an insight was found. If the organization wanted to claim a savings result credibly, it needed a way to record opportunities, assign accountability, distinguish different kinds of savings, track actions, and validate outcomes. Over the following months, SNC would build a more formal savings register and operating cadence around that need.

The more demanding quarterly savings target did not replace the other reasons SNC had adopted TBM. ITFM modernization, cost transparency, TCO, planning, and longer-term value conversations remained part of the agenda. It did, however, sharpen the financial test applied to the adoption: SNC was expected to demonstrate realized savings while the Practice itself was still being established.

That pressure also influenced implementation choices. The team considered how TBM classifications such as controllable and non-controllable spending could support the search for actionable savings rather than treating taxonomy solely as a reporting structure. The question increasingly became not just whether SNC could categorize technology spending accurately, but whether the resulting information helped someone make and execute a better financial decision.

Building Capability While Expectations Were Moving

By spring 2026, SNC had advanced substantially beyond its December starting point. Budget data had been loaded and validated, actuals validation was progressing, expense and labor mappings were being developed, automated data flows were being established, team members had completed TBM training, OCM activities were underway, and a steering committee had been created. The first use cases were moving from designs and configuration toward information that people could begin to use.

Implementation had also exposed work that had been less visible at the outset. SNC needed more internal TBM capability than a technical implementation alone could provide. Governance had to mature while decisions were already being made. Change management had to catch up with work that had started before dedicated OCM involvement. Data integration created new stewardship and correlation questions. A savings expectation that had once been one measure of value had become a much more demanding test of whether the organization could turn insight into verified financial action.

None of this changed SNC’s underlying purpose. The organization was still pursuing greater transparency into technology economics and trying to use that transparency to improve decisions. What was changing was its understanding of everything required to accomplish that purpose.

The environment around the adoption was changing as well. SNC was reconsidering how parts of the enterprise organized work, products, capabilities, and accountability at the same time that the TBM team was trying to establish its own enduring operating model. Those changes affected assumptions behind the roadmap and the two initial use cases in different ways.

When the Roadmap Met a Changing Organization

By April 2026, the environment described in SNC’s 2025 roadmap was changing. The organization was moving toward a product-oriented operating model on the indirect side of the business and developing mission value streams and business capabilities to describe how enterprise work created value. Organizational restructuring was occurring at the same time, while Lean-Agile practices and AI initiatives added further change around the people participating in TBM.

These developments did not originate with TBM. Participants were explicit that the broader operating-model change was already underway and that TBM was converging with it rather than driving it. The changes also affected adoption in different ways. Some altered the structures TBM was attempting to represent, some changed how the TBM team itself worked, and others primarily competed for attention and organizational capacity.

The move toward products, mission value streams, and business capabilities had the most direct effect on the TBM Model and the Product TCO use case. SNC was still defining the customer-facing structures to which technology costs could ultimately be connected. The ambiguity present at the start of implementation—TCO of what?—now had practical consequences. A TCO model built around organizational constructs that were being replaced or redefined could become obsolete almost as quickly as it was completed.

By July, SNC had finalized its mission-value-stream and business-capability structure and was working to align the TBM Solutions layer to it. The change required some earlier TCO work to be revisited, but it also gave the team a clearer basis for connecting technology economics to the emerging operating model.

The Lean-Agile change affected a different part of the adoption: how the TBM team itself organized and delivered work. During the initial implementation, the partner team provided the delivery structure, the implementation expertise, the plan for the first use cases, and the mentoring to the SNC team through data ingestion, modeling, configuration, and validation. As SNC approached the end of that initial phase, it did not intend to preserve an implementation-project model indefinitely. Beginning in the spring, the team started moving toward an enduring shared-service model with continuing capacity, defined responsibilities, a backlog of work, and Lean-Agile methods for prioritizing and delivering improvements.

Mr. Baker described the change as a move away from a largely waterfall, partner-led implementation toward an integrated team in which external expertise remained available but operated as part of the group. This was more than a change in project-management technique. New requirements would continue to emerge, data and mappings would need stewardship, use cases would evolve, and the Practice would need a mechanism for deciding what to work on next. The Practice would also need to pay for itself to avoid increasing SNC’s run-the-business expenses.

By May, SNC was increasingly treating TBM as a service rather than an implementation project. The internal team was taking greater responsibility for the work while the implementation partner receded from day-to-day leadership. Service ownership developed as a collaborative rather than highly hierarchical arrangement: routine operating decisions could be resolved within the team, while larger or higher-risk issues could move through the governance structure. This gave the Practice a way to continue developing without requiring every question to become a steering-committee decision.

Other changes surrounding the adoption were less directly structural. AI initiatives, organizational optimization, and related enterprise changes increased the amount people were learning and the number of priorities competing for attention. Participants later described the simultaneous adoption of TBM, Agile ways of working, and AI as a steep learning curve. They did not characterize that environment as uniformly harmful, however. The same organizational changes that created complexity could also create clearer ownership and stronger support for the kind of cost and value information TBM was intended to provide.

SNC did not respond to a moving organization by freezing TBM until conditions stabilized, nor did it attempt to execute every element of the original roadmap regardless of what had changed. The team continued building the underlying capability while revisiting how and where it should be applied. The consequences became clearest in the different paths taken by the two original use cases.

Two Use Cases, Two Different Dependency Structures

IT Financial Management and Product TCO began as the two principal use cases in SNC’s initial implementation, but they were not equivalent undertakings. ITFM sought to improve financial processes the organization already performed. Product TCO sought to create a new analytical capability whose usefulness depended on organizational structures and information that were themselves still developing. As those differences became visible, progress on one use case increasingly ceased to be a useful proxy for progress on the other.

IT Financial Management: From Implementation Toward Recurring Use

The original ITFM objective was ambitious but easy to understand. SNC wanted to move financial-management activities away from spreadsheet-heavy processes and into the platform’s mature ITFM capabilities, improve planning and costing, reduce manual reporting work, and create a more scalable way to manage technology finances. The team intended to move quickly, with planning and cost-management capabilities among the objectives targeted during the first months.

By spring, important parts of that foundation were in place. Budget information had been loaded and validated, the team was validating actuals, and expense mappings had progressed through towers and subtowers. SNC believed it had integrated the data needed for its two immediate use cases and was working toward a recurring monthly process rather than a one-time implementation exercise.

Completing the configuration did not mean that the operating process worked as SNC expected. One of the first significant limitations appeared when the team attempted to reconcile actual spending with forecasts in the way IT Financial Management required. The platform could not aggregate actuals by project and vendor together in the form SNC needed. Multiple forecast lines could therefore appear against a single lump-sum actual, making it difficult to determine directly in the platform whether spending had occurred as expected. The team continued using external reports for portions of that reconciliation while working with the implementation partner and technology provider on how to address the feature gap.

The issue mattered because one of the original reasons for implementing ITFM was to reduce precisely this kind of manual financial work. At the time, SNC did not interpret the limitation as evidence that the broader TBM effort was failing. The team was generally satisfied with implementation progress and attributed schedule pressure more heavily to internal capacity than to execution ability. But the feature gap introduced an early difference between getting financial information into the platform and replacing the operating processes that had existed outside it.

SNC completed its May budget cycle and spent the summer transitioning more of the recurring process into the platform. By July, the team described ITFM as being in an early operationalization phase and began using Objectives and Key Results to assess whether the use case was producing the outcomes it wanted. The measures under discussion went beyond whether the platform had been deployed into production; SNC was interested in changes such as cycle time and dependence on spreadsheets, although limited historical measurements made some comparisons difficult.

The scope of the financial work was also expanding. Organizational restructuring accelerated the inclusion of budget information associated with the Chief Operating Officer organization, bringing additional technology-related spending into the planning environment. This increased the potential reach of ITFM, but it also exposed differences in how financial processes were performed across SNC. Participants later described highly siloed and inconsistent practices among different parts of the organization. TBM could make those differences visible, but visibility did not itself standardize the upstream processes producing the information.

By August, the ITFM tooling had reduced some manual reporting effort. The team saw an opportunity to spend less time producing routine reports and more time responding to new analytical requests.

Other parts of the original objective remained incomplete. Data still required considerable “wrangling,” actuals and forecasts did not always align cleanly, and some established manual processes continued. Most budget owners were not yet independently using the new information; the TBM and ITFM teams were still largely extracting, interpreting, and presenting it for them. TBM Service Owners described the state in late August as closer to team-mediated consumption than true self-service, while expecting that the next budget cycle would provide a better test of whether user behavior was changing.

That gap became particularly visible when SNC began showing tower-level costs to budget owners. Directors expressed interest in the information, but the ITFM team still had to pull and present it, and Mr. Baker questioned whether consumers could fully appreciate the tower view before SNC had connected it more completely to the Solutions and Consumer layers of the model. Information had become available before independent consumption had become routine.

By the beginning of September, SNC had completed its first full financial cycle in the platform within its target timeframe, but the ITFM outcome remained mixed. The TBM information itself was becoming useful, and the team expected the tower views to provide increasing value. The more specific goal of getting financial management out of spreadsheets, however, had not been achieved.

The historical contract spreadsheet used before the implementation was still being maintained. Each month, the team manually validated general-ledger activity, compared actual results with the expected forecast, and made forecast adjustments when spending did not occur as anticipated. The TBM platform had entered the operating process without displacing all of the mechanisms SNC originally expected it to replace.

ITFM had therefore moved considerably further than its starting point without reaching the clean end state envisioned at implementation. SNC had a recurring process, broader financial information, new cost views, and less effort in some reporting activities. It also retained manual reconciliation, spreadsheet dependencies, data-management work, and team-mediated consumption. Implementation completion and use-case realization had become visibly different measures of progress.

Product TCO: Building Against a Target That Was Still Moving

Product TCO encountered a different problem. Its central challenge was not migrating an existing recurring process into a new environment; SNC was trying to establish a new way of understanding the full cost of a product or service while the organization was still designing and implementing a new product-based operating model.

The team initially chose Schedule Management as the product through which to develop the use case. By April, SNC was working toward TCO visibility for Schedule Management and had identified dependencies that extended beyond simply allocating existing financial data. Labor planning for non-IT participants, for example, affected whether the model could capture the relevant costs. The work also required SNC to think differently about how costs should be associated with a product rather than defaulting to familiar organizational or charge-code structures.

As the enterprise operating model evolved, the analytical target became less stable. Rather than finalize a TCO design against an organizational model that was still changing, the TBM team allowed its approach to evolve with the developing mission-value-stream and business-capability structure.

By July, that structure had become sufficiently established for the team to begin remapping the TCO approach. The process exposed another limitation in the initial effort. SNC could assemble cost information, but the Schedule Management pilot did not yet have enough baseline, planning, and benchmarking information to provide the context needed for useful comparison and insight. Knowing a cost was different from knowing whether that cost was appropriate, improving, or actionable.

The team stepped back from simply producing a TCO number and focused on strengthening the information needed to interpret it. Existing Configuration Management Database (CMDB) data proved useful for portions of infrastructure and application costing, indicating that those sources could support the model in those areas. Other requirements depended less on raw data availability than on the organizational and analytical context in which the data would be used.

Then the business priority changed. Organizational restructuring caused Schedule Management itself to be deprioritized, and by August SNC was no longer pursuing that specific implementation on the original trajectory.

The change did not erase the work already performed. SNC had developed foundational elements that could support future product and service costing, and the team had learned more about the data, labor, planning, baseline, and organizational structures required to construct a defensible TCO view. But the evidence at the end of the research period does not support treating Product TCO as a fully operationalized reusable capability. SNC had advanced its understanding and built portions of the foundation while still needing additional groundwork before it could reproduce the intended full-cost analysis for another product or service.

The contrast with ITFM helps explain why use cases can progress at different rates even when they share the same TBM Practice and Model. ITFM had become a recurring operating process, albeit with incomplete realization of some intended benefits. Product TCO remained an incompletely operationalized analytical capability after its initial target changed. ITFM could build on an established monthly financial process, known owners, existing reports, and recurring organizational demand; Product TCO depended on agreement about the object being costed, stable organizational structures, appropriate labor and operational information, baseline and planning context, and a business priority that remained important long enough for the analysis to mature.

SNC did not discover all of those dependencies by completing a prerequisite checklist before implementation. It discovered them by attempting the use cases.

Evaluating Platform Fit Through Operational Experience

SNC’s experience with ITFM also changed how it evaluated the technology decision made before implementation. The original selection had reflected a successful pilot, capabilities aligned with the initial use cases, an established TBM track record, future technology considerations, and security requirements that narrowed SNC’s available choices. Those factors provided a reasonable basis for proceeding, but operational use introduced requirements and constraints that were difficult to fully evaluate during selection.

The financial-reconciliation limitation described earlier illustrated that difference. A requirement that had appeared manageable during implementation became more consequential when it affected a recurring monthly process. SNC had succeeded in bringing financial information into the platform and establishing new cost views, but some of the operating processes the technology was expected to replace remained dependent on external reports and manual work. This was a limitation of the selected technology in a specific SNC workflow, not of TBM or IT Financial Management as disciplines.

Other expectations depended on a broader combination of technical and organizational conditions. As SNC moved from core-team implementation toward wider use, data integration, access and security decisions, consumer understanding, and established working practices all influenced whether information became independently useful. Self-service reporting, for example, required more than making information technically available. By late August, Mr. Baker acknowledged that some expected benefits, including self-service, had not yet been fully realized.

These experiences also prompted internal questions about whether SNC’s existing tooling would remain appropriate for its evolving needs. Mr. Baker distinguished those questions from the organization’s commitment to TBM. The team continued to see value in the management discipline and in the information produced through the TBM Model, even as operational experience exposed difficulties integrating financial and operational information and completing the transition away from established manual processes. The issue was no longer simply whether the selected technology could support the initial implementation, but how well it could support the operating capability SNC intended to develop.

The executive sponsors drew a similar distinction at the end of the research period. Mr. Giannetta and Mrs. Jacobs said the TBM investment had met their expectations, pointing to financial returns and TBM’s increasing connection to SNC’s evolving operating model. Mr. Giannetta nevertheless characterized the technology platform’s value as “to be determined.” His questions included data capacity and whether its embedded AI capabilities would be sufficient for the organization’s anticipated future requirements. These were concerns about long-term suitability rather than evidence that the initial TBM investment had failed to deliver value.

SNC’s experience therefore distinguished three questions that had initially been easier to consider together: whether TBM was useful, whether the organization was developing the capability to practice it, and whether the selected technology was the best long-term mechanism for supporting that capability. The answers did not need to be identical. Platform fit could remain under evaluation even as SNC continued to invest in TBM as an operating discipline.

Adapting Without Starting Over

The changes SNC encountered during 2026 disrupted portions of the original roadmap, but they also created new possibilities. The emerging product and capability model forced the team to revisit TCO assumptions while providing a stronger structure for future cost-to-value connections. Lean-Agile ways of working added another methodology for the team to learn while helping SNC shift TBM from a finite implementation toward an enduring service. Organizational restructuring changed priorities and expanded some financial responsibilities while removing the immediate business case for the original Schedule Management TCO target.

Participants recognized this dual effect. In August, members of the team said the simultaneous changes could slow TBM by increasing complexity and the amount everyone had to learn. They also observed that those same changes could create ownership and organizational backing that TBM might otherwise have struggled to establish.

SNC responded by preserving the purpose behind the adoption while changing portions of the path. ITFM continued toward recurring operation even though the technology did not eliminate all of the manual work. Product TCO was allowed to pause and remap when its organizational target changed. New organizational structures were incorporated into the model as they became sufficiently stable to use, and platform limitations were investigated without being treated as a reason to discard the methodology.

This adaptation did not resolve every problem. At research close, stakeholder self-service remained incomplete, Product TCO required additional development, manual financial work persisted, and questions about the long-term technology platform remained open. But SNC was no longer dependent on the assumption that adoption would proceed exactly as the 2025 roadmap had anticipated. The question had shifted toward whether the capabilities developed through the adoption were sufficient for SNC to keep operating, learning, and extending TBM after the original implementation phase had passed.

From Implementation to an Operating TBM Practice

By the end of the research period, SNC was no longer operating TBM primarily as an implementation project. The external implementation phase had receded, the internal team had assumed responsibility for ongoing work, and mechanisms developed during implementation were becoming recurring parts of the Practice.

SNC had established internal service ownership across TBM, IT Financial Management, FinOps, technical enablement, and related areas. The collaborative service-ownership model that had begun emerging in the spring was now supporting routine operation: working-level decisions could generally be resolved among the people doing the work, with higher-risk or more consequential issues escalated through governance.

Other mechanisms had acquired their own cadences. ITFM was operating monthly. The savings register and associated analysis were being reviewed biweekly. Maturity assessment was moving from a one-time diagnostic toward a recurring exercise. Data pipelines were operating, while the TBM Practitioner Course and Certification had helped develop shared TBM knowledge across the core group, and participants were applying that knowledge to modeling and mapping decisions, financial management, roles and responsibilities, and the continuing development of the Practice.

These mechanisms had not all reached the same level of maturity, and some responsibilities were still being clarified. What SNC had established was not a finished enterprise capability but an operating structure capable of continuing work that no longer fit comfortably inside an implementation project.

Data Became an Operating Responsibility

The evolution of SNC’s data work illustrates that transition. Early in the adoption, the task had largely been described in implementation terms: obtain the necessary extracts, map them, validate them, load them into the ITFM platform, and move toward automated ingestion. By late summer, SNC had functioning pipelines and recurring calculations, but operating those pipelines was exposing weaknesses and inconsistencies in the source environment.

Several TBM leaders described the development of the data pipeline as one of the mechanisms that forced SNC to confront gaps in knowledge and ingestion across the CMDB and other source systems. The earlier challenge had been connecting information created for different operational purposes. Once those connections became recurring, SNC also had to maintain them and address problems that repeatedly entered the model from upstream systems and processes.

Some problems still belonged inside the TBM Model or its transformations, but others increasingly pointed upstream. If an organizational relationship was inconsistent, a procurement process generated information in a form that was difficult to correlate, or an operational source did not maintain a relationship TBM required every month, repeatedly correcting the result inside TBM would not solve the underlying problem.

The service-owner discussion in August reflected this change. Participants continued to describe significant “data wrangling,” but also described transparency itself as becoming part of the operating mindset. The team could now see recurring issues that had previously been distributed across individual systems and processes. Extending financial transparency into additional parts of SNC similarly exposed differences in how organizations performed comparable financial work.

SNC had not “finished” its data work by building the pipelines. The work had shifted from initial acquisition and integration toward an ongoing responsibility for understanding, governing, and improving the relationships among data. A functioning TBM Model was becoming one of the mechanisms through which upstream problems could be identified.

What Value Had SNC Demonstrated?

SNC began the adoption with several expectations for value, and the research did not produce a single measure capable of capturing all of them. By September, evidence existed in at least three areas: financial outcomes, operating capability, and improved transparency.

The clearest quantitative claim came from the savings work. By late August, Mr. Baker reported that SNC was on track to reach approximately $1.2 million in hard savings, compared with the initial approximately $300,000 savings expectation and consistent with the later $300,000-per-quarter target over four quarters. Cloud optimization and renegotiations were among the sources contributing to that trajectory. The reported savings trajectory alone did not establish a calculated return on the total TBM investment.

Mr. Baker was also explicit about the limits of the claim. He did not contend that TBM independently caused every dollar of savings; some of the underlying actions might have occurred without the TBM adoption. What he attributed more directly to TBM was the rigor SNC had developed around defining, identifying, classifying, validating, and defending those savings as genuine cost reductions.

That rigor had evolved considerably from the February conversation in which the team first clarified that realized savings, rather than identified opportunities, were the relevant measure. By August, SNC had operationalized a savings register and a biweekly analytical cadence. The Practice had developed a repeatable process for moving from an opportunity toward a financially supportable result rather than relying on an accumulation of optimization anecdotes.

The evidence therefore supports a narrower and more useful conclusion than attributing the entire reported amount to TBM. SNC had built a value-realization discipline through which optimization activities could be evaluated against common definitions and tracked toward realized financial outcomes. TBM could contribute to discovering opportunities, but its demonstrated contribution also included the management structure through which those opportunities were classified and validated.

Other value was less easily expressed as a dollar amount. ITFM had established recurring monthly use of TBM information, reduced some report-production effort, and begun exposing technology costs through a common tower structure. The Practice had developed governance, service ownership, common terminology, training, maturity assessment, and operating cadences that had not existed in the same form when implementation began. These capabilities mattered because SNC’s objective was not simply to produce a set of reports once; it was to establish a way of managing technology economics that could continue to develop.

Important anticipated benefits nevertheless remained unrealized. Broad self-service consumption was limited, portions of the financial process remained manual, Product TCO had not matured into a reusable capability, and connections between technology cost and the newly stabilized enterprise capability model were still developing. Those conditions place a necessary boundary around claims about what SNC had achieved by research close.

The executive sponsors nevertheless viewed the TBM investment positively. In the final sponsor discussion, Mr. Giannetta and Mrs. Jacobs said the investment had met their expectations and pointed to the financial results as evidence of progress beyond the original savings expectation. They also saw TBM becoming increasingly relevant to SNC’s broader discussions about capabilities, value streams, investment, and accountability.

Their assessment does not convert unfinished work into completed outcomes. It provides a different kind of evidence: the people who had sponsored the adoption continued to see value in the management capability despite knowing that important parts of the original agenda remained incomplete.

What Remained Unfinished

The end of the research period offers a useful point at which to assess SNC’s progress precisely because the organization had advanced far enough for its remaining gaps to be visible.

For ITFM, the recurring process was operating, but portions of the original process-modernization objective remained incomplete and team-mediated consumption persisted. Product TCO remained less mature: the Schedule Management work had exposed important requirements and produced foundational work, but SNC had not yet demonstrated that it could take another product or service and reliably reproduce the intended full-cost analysis. The enabling technology itself remained under evaluation as SNC compared the value it saw in TBM with limitations encountered in operational use.

The Practice also remained developmental. Governance existed, but the organizational environment around it continued to evolve. Change management had become more integrated into the work, while stakeholder behavior had not yet caught up with all of the information available. Data pipelines were operating, but source-system and process issues had become continuing stewardship work. Maturity assessment showed movement while continuing to identify areas requiring investment.

These conditions are not well described as a list of failed implementation requirements. Some were unfinished transitions, some reflected limitations in the enabling technology, some depended on organizational structures that had changed, and others represented operating responsibilities that would never be permanently “finished.” SNC had progressed beyond implementation without reaching a point at which TBM could be regarded as a completed enterprise capability.

Lessons for TBM Adopters

SNC’s experience does not provide a universal sequence for adopting TBM. Its operating environment, government-market requirements, distributed technology model, concurrent organizational changes, and initial use cases shaped many of the decisions documented in this case. Several lessons nevertheless emerge from how those decisions played out.

Use Early Work to Learn What the Larger Adoption Requires

SNC’s December 2024 pilot was valuable partly because it was limited. It gave the organization a practical way to test TBM and the enabling technology before committing to a broader implementation, but it also exposed the inadequacy of the pilot’s own boundary. Technology and cost relationships crossed between IPM and IT, making a broader organizational perspective necessary.

SNC responded not by simply scaling the pilot configuration but by conducting a wider assessment, developing a future-state roadmap, seeking executive support, and then moving into implementation. Early TBM work can therefore serve as a way to discover the boundaries and dependencies of a larger adoption rather than as proof that the final design has already been found.

Distinguish Implementation Support From the Capability the Organization Must Own

The implementation partner brought experience SNC did not possess internally, along with familiarity gained during the preceding assessment. That expertise helped SNC move through data ingestion, mapping, configuration, modeling, and the initial use cases. But SNC could not outsource the organizational understanding required to operate TBM after the implementation engagement ended.

SNC developed that understanding through several mechanisms. The TBM Practitioner Course and Certification gave a growing group of participants a shared grounding in TBM that they could apply to mappings, roles, responsibilities, and Practice design. Maturity assessment exposed organizational capabilities that technical implementation alone did not reveal. Hands-on implementation then forced the team to translate both forms of structured learning into decisions specific to SNC. Governance, stakeholder relationships, operating methods, change management, data stewardship, and future use-case development increasingly became responsibilities SNC itself had to own.

For adopters, the implication is broader than simply providing TBM training or selecting an experienced implementation partner. An organization needs to develop enough internal TBM understanding to participate meaningfully in implementation decisions, recognize capabilities that still need to be built, challenge or extend what an implementation scope provides, and eventually operate the Practice without depending on external specialists to interpret TBM for it. SNC’s experience suggests that practitioner education can contribute directly to that transition when participants have opportunities to apply what they learn to real adoption work.

Evaluate Use Cases According to Their Own Dependencies

ITFM and Product TCO demonstrate why a shared TBM foundation does not mean use cases will mature together. One built upon a recurring process with established owners, known financial cycles, and existing organizational demand. The other depended on a less stable combination of organizational definitions, labor and operational information, planning context, baselines, and an analytical target that remained a business priority.

Use-case planning should therefore extend beyond determining whether required data appears to exist. Adopters also need to consider whether the organizational objects, decision processes, owners, comparative context, and consumers required by the use case are sufficiently stable for the analysis to become useful.

Treat Technical Availability and Adoption as Different Conditions

SNC repeatedly encountered the difference between producing information and changing how people used it. By late summer, systematic financial information was available and budget owners were beginning to see new cost views, yet the ITFM team still frequently extracted and presented the information on their behalf. Training, access, and positive initial reactions did not by themselves establish independent consumption.

SNC’s OCM chronology reinforces the point. Change management was recognized as necessary from the beginning but entered practical execution later than SNC considered ideal. Communications, stakeholder analysis, training, and engagement subsequently developed, yet the consumption gap remained at research close. The evidence does not establish that earlier OCM would have eliminated that gap, but it demonstrates why organizations should plan for the behavioral transition before technical availability makes it urgent.

The relevant adoption question is not simply whether users can access TBM information, but whether they trust it, understand it, seek it out, and use it differently in recurring decisions.

Let the Roadmap Change When the Organization Changes

SNC’s roadmap encountered a product operating model, mission value streams, business capabilities, restructuring, Lean-Agile adoption, AI initiatives, and other changes occurring around TBM. Participants explicitly rejected the idea that TBM caused those developments; the challenge was determining how the Practice should respond to them.

SNC retained continuity in the problems it was trying to solve while reconsidering the means, sequence, and sometimes the immediate analytical target. Product TCO was remapped as the capability model stabilized and later redirected when Schedule Management lost priority. The TBM team changed its own operating model, and additional financial scope entered ITFM following restructuring.

For adopters operating in changing organizations, preserving the management objective while allowing the roadmap to adapt can prevent adherence to an outdated deliverable from becoming more important than the decision capability the deliverable was intended to create.

Make Realized Value a Managed Process

The increase in SNC’s savings expectation forced the Practice to distinguish opportunity from outcome. Identifying potential savings was not sufficient; an action had to occur and its financial effect had to be validated before SNC considered the saving realized.

The resulting savings register, definitions, and recurring analytical cadence gave the organization a way to govern that progression. By late August, Mr. Baker could report a substantial hard-savings trajectory while still acknowledging that not every underlying optimization action had been caused by TBM.

A TBM Practice does not need to claim causal ownership of every cost reduction to contribute to value realization. It can provide the common definitions, transparency, accountability, and validation discipline through which an organization determines which opportunities became actual financial results.

Expect Data Work to Become Stewardship Rather Than Disappear

SNC entered implementation needing to extract, map, and correlate data from systems designed for different purposes. As automated pipelines and recurring calculations developed, the problems became less about obtaining a one-time dataset and more about maintaining relationships, addressing recurring exceptions, and improving upstream processes.

Waiting for every source to become perfect before beginning would have prevented SNC from learning where many of the relevant problems actually existed. Getting data into the model, however, did not mean the data problem had been solved permanently. Data maturity changed the nature of the work from implementation preparation toward continuing stewardship, requiring an operating mechanism for that responsibility.

Reassess the Technology Without Confusing It With the Practice

SNC’s experience with its enabling technology illustrates why platform and TBM assessments should remain distinct. The original selection was based on legitimate requirements and evidence available at the time. Operational use later revealed limitations that affected important SNC ITFM workflows.

By research close, SNC could simultaneously see value in TBM and question whether the platform would meet every long-term need. A management capability should be able to survive critical evaluation of the technology used to enable it. Technology selection should therefore remain subject to evidence gathered during actual use rather than becoming a decision the organization feels obligated to defend indefinitely.

Treat Executive Sponsorship as an Operating Capability

Mr. Giannetta and Mrs. Jacobs did more than advocate for SNC’s initial investment. They worked together to respond to the CFO’s and COO’s expectations for better understanding the value of technology spending, and their sponsorship helped secure approval for the initial investment. Their complementary technology and business-financial perspectives remained relevant as governance developed, savings expectations changed, and TBM became connected to broader discussions about enterprise capabilities and value.

The persistence of sponsorship was particularly important because the adoption crossed organizational boundaries and encountered changes that could not be resolved solely within the implementation team. SNC’s experience suggests that sponsorship has continuing value after funding and kickoff, especially when TBM begins challenging existing definitions, processes, priorities, or organizational responsibilities.

For organizations considering dual or complementary sponsorship, the SNC case shows the potential contribution of access to different forms of organizational authority and different perspectives on what TBM is expected to accomplish.

Closing Perspective

SNC’s adoption began with questions that were relatively easy to state: What does technology cost? Can those costs be explained consistently? Can financial management become more scalable? Can technology spending be connected more clearly to the products, services, and outcomes it enables? The work that followed demonstrated that answering those questions required more than implementing a model or technology. SNC had to develop the organizational capability to keep asking, answering, and acting on them as its needs changed.

That capability developed through the interaction of many of the elements traced throughout this case. The pilot helped SNC test the value of TBM while revealing the need for a broader organizational scope. The assessment and roadmap provided direction, but implementation exposed requirements that the roadmap alone could not anticipate. Practitioner education helped SNC personnel develop the knowledge to participate more fully in the work and recognize capabilities the Practice still needed. Governance, change management, service ownership, maturity assessment, data stewardship, and value-realization mechanisms developed alongside the initial use cases rather than waiting for implementation to finish. As SNC itself changed, the Practice learned to reconsider use cases, mappings, priorities, and even its enabling technology without abandoning the management purpose that had motivated the adoption.

The different trajectories of IT Financial Management and Product TCO illustrate why that distinction matters. ITFM became a recurring operating process while retaining manual work and incomplete stakeholder self-service. Product TCO exposed valuable requirements and produced foundational work without yet becoming a repeatable capability. The savings work progressed differently again, evolving into a disciplined process for identifying and validating financial outcomes. Data integration made information available while creating an enduring stewardship responsibility. None of these developments can be captured particularly well by asking whether SNC had simply “implemented TBM.” They represent different dimensions of a management capability developing at different rates.

That is also why unfinished work does not sit outside the story of SNC’s adoption. By the close of the research period, SNC had established recurring operating mechanisms, internal ownership, governance, trained practitioners, functioning data flows, active use cases, and evidence of financial value. At the same time, stakeholder use could deepen, Product TCO and the cost-to-value model could develop further, financial processes and data could continue improving, additional use cases could be pursued, and the Practice itself could continue to mature. Those conditions were not contradictory. They reflected the transition from establishing TBM to operating and developing it as an enduring organizational capability.

SNC’s experience therefore offers a different way to think about the endpoint of a TBM adoption. The objective is not to reach a moment when the model, use cases, data, processes, and Practice can all be declared finished. It is to establish enough organizational capability that TBM no longer depends on an adoption project to continue. SNC reached the research close with that work increasingly in the hands of an operating Practice: one capable of sustaining what had been built, learning from what remained incomplete, responding when organizational conditions changed, and deciding where TBM should create value next. The adoption effort had established the foundation; the continuing measure of that foundation would be what SNC could build and accomplish with it.

Red Hat built the world’s largest enterprise open-source software company, growing into a multi-billion-dollar firm before being acquired by IBM Corp. This open-source heritage often placed the value of technology in the product and engineering realm rather than with IT. Thus, not surprisingly, Red Hat’s TBM journey started with a new CFO wanting to know why IT costs were so high. Through the TBM framework and discipline, Red Hat IT successfully delivered cost transparency of all IT spend and then became a model for technology spend planning and forecasting. The IT team added the FinOps discipline to its capabilities and is now managing a broad hybrid cloud portfolio. However, TBM and FinOps have remained in the realm of IT only, until now. Red Hat’s current CIO, Jim Palermo, is driving TBM, FinOps, and Enterprise Agile Management across the company based on IT’s success and through the lens of value stream management. in this session, Jim will walk through Red Hat’s TBM journey and its current transformation to an operational business architecture framework built on value streams aligned to business outcomes.


Speaker:

  • Jim Palermo, VP, CIO, Red Hat

When the team at Tenet Healthcare made the decision to move towards a model that provided more accurate financial transparency, they looked to TBM practices and solutions. Join Paola Arbour, EVP and CIO at Tenet healthcare as she answers the question “why TBM?”, including what Tenet was trying to solve with the TBM Taxonomy, the effectiveness of their KPIs, and how building support and momentum across the entire company was critical to their successful TBM adoption. In this session, Paola will also share how Tenet continues to evolve their use of TBM, including for mergers, acquisitions, and divestiture activity, as well as segmenting cost structures.


Speaker:

  • Paola Arbour, EVP & CIO, Tenet Healthcare

Data driven decision making has been a key to longevity and delivering best in class service to State Farm’s customers over the past 100 years. Recently, State Farm decided to use a managed services company for the day-to-day support of their Infrastructure Services. Today’s technology leaders need to be able to make real-time, informed decisions to help ensure technology investments are meeting their customer’s needs, while continuing to support company long-term goals. Ashley Pettit, SVP & CIO at State Farm, will be joined by Randy McBeath, Enterprise Technology Executive, and Andy Moore, Technology Director, and together they will share how TBM aided in State Farm’s analysis and decision to move to a managed service provider.


Speakers:

  • Ashley Pettit, SVP & CIO, State Farm Insurance
  • Andy Moore, Technology Director, State Farm Insurance
  • Randy McBeath, Enterprise Technology Executive, State Farm Insurance

There is fast evolution occurring in the overall technology spend and value management market, with the advancements of cloud, Kubernetes, AI/ML, and other innovations. At the same time, we are seeing vast changes in the roles of the CIO, CFO, and business/digital leadership. In addition, TBM is intersecting with other disciplines and frameworks, such as Cloud FinOps, Agile engineering, and portfolio resource management. How is this affecting the TBM discipline, the TBM Council, and Apptio? For one, TBM is moving down market, becoming more accessible to all sizes and maturity of organizations, with easier ways to get started and a faster time to value. Cloud FinOps, meanwhile, is advancing and adding capabilities previously in TBM to the cloud cost management space. Join Apptio CEO Sunny Gupta as he explores the evolving TBM landscape and how he believes it will bring even greater opportunity and value to organizations worldwide.


Speaker:

  • Sunny Gupta, Co-Founder & CEO, Apptio

In today’s challenging economic times it is critical that CFOs, CIOs, and CTOs speak the same language when it comes to the value of technology spend. Having a single source of truth that everyone can feel confident in, track progress continuously throughout the year with shared insights, and analyzing options for resourcing and funding in order to reduce waste is where TBM deepens their partnership. In this discussion, join members of the TBM Council Board of Directors as they discuss the pivotal conversations and steps taken to collectively adopt TBM practices across the organization, including responding to naysayers and gaining allies.


Panelists:

  • George Maddaloni, EVP, CTO, Operations, Mastercard
  • Laura Walsh, CIO, Smithfield Foods
  • RJ Hazra, SVP & CFO, Technology & Security, Equifax
  • Moderated by Chad Doiran, Managing Director, Tech. Strategy & Advisory, Accenture

Fumbi Chima has led technology teams across multiple organizations throughout her esteemed career, including retail, manufacturing, media, and financial services. As a turnaround and high growth leader, Fumbi has leveraged TBM as a foundational practice to bring repeatable processes, purchasing guidelines, and cost/resource savings. Now at Boeing Employe Credit Union (BECU) serving more than 1.2 million members, Fumbi is driving their digital transformation with a clear vision and strategy to optimize their public-cloud with TBM and Cloud-FinOps, adopt a product model, and set the groundwork for future innovation and growth. Join Fumbi and Larry Blasko, President, Field Operations at Apptio, as they discuss the lessons Fumbi has learned along her TBM journey, and where this transformation leader sees the evolution of TBM taking the Technology industry.


Speakers:

  • Fumbi Chima, Chief Technology & Transformation Officer, BECU
  • Larry Blasko, President, Field Operations, Apptio

Technology leaders have a unique opportunity to transform their organizations into environmental champions with sustainable business practices. In this session, Neal Ramasamy, CIO at Cognizant and Phil Alfano, Field CTO at Apptio will share how TBM can be leveraged to achieve comprehensive visibility into real-time data-driven tracking to ensure company goals and actions are being met to achieve a sustainable future.


Speakers:

  • Neal Ramasamy, CIO, Cognizant
  • Phil Alfano, Field CTO, Apptio

For McGraw Hill, having a transparent framework that drives smart investment strategies and a common language across this 135-year-old company is critical. Known as one of the “big three” education publishers, McGraw Hill must stay ahead of their competitors with innovation and value delivery. Join Yuliya Oberman, Finance Director for McGraw Hill Education and Eileen Wade, General Manager of the TBM Council as they discuss how TBM is essential to McGraw Hill’s enterprise resource strategies and digital transformation journey.


Speakers:

  • Yuliya Oberman, Finance Director, McGraw Hill Education
  • Eileen Wade, General Manager, TBM Council

In this fireside chat, Matt Yanchyshyn, GM, AWS Marketplace & Partner Engineer at AWS will join incoming General Manager of the TBM Council, Jack Bischof, for a discussion on best practices for building successful TBM practices focused on cloud financial management. Including a deep dive into the nuances, learnings, and milestones that the world’s 9th largest insurance company is achieving on their Cloud FinOps journey.


Speakers:

  • Matt Yanchyshyn, GM, AWS Marketplace & Partner Engineering, AWS
  • Jack Bischof, Incoming General Manager, TBM Council

Hear from Ajay Patel, COO at Apptio and Zubin Irani, CEO at Cprime as they discuss how the intersection of TBM and enterprise agile planning is a critical strategy for organizations to adopt if they want to drive business growth more efficiently, in real-time, and keep up with the speed of change that today’s organizations face.


Speakers:

  • Ajay Patel, COO, Apptio
  • Zubin Irani, CEO, Cprime

Join Origin Energy’s Adrian Thivy, GM, Enterprise Technology Services, as he shares how TBM is creating complete confidence in their spend-to-value ratios across IT and the broader company, allowing a rapid response to the market forces driving significant pressure on the “cost to serve” customers. A finalist for the 2022 TBM Council Award for TBM Pacesetter, hear how their TBM practice was built in record time, including lessons learned as they developed business capabilities and managed a significant cloud migration and transformation.  

Session topics will include:  

  • Establishing a clear purpose and common goals that drive cross-functional understanding
  • Utilizing an adaptative governance framework to ensure accountability across all stakeholders 
  • Leveraging TBM and ServiceNow CSDM to deliver a transparent, flexible, and sustainable model in a shorter time frame
  • How bespoke logic has dramatically improved transparency of cost more than 90%


Presented by:

  • Adrian Thivy, GM, Enterprise Technology Services, Origin Energy 

Many organizations aspire for a cloud-native posture, however few have the time, resources and budget to transform into 100% public cloud operations. Equifax has broken through those barriers to modernize its infrastructure globally — driving faster innovation for customers, more business agility, and stronger cybersecurity. Hear from Manav Doshi, GM, Technology Solutions on how the Equifax team is rebuilding a century-old company, with a real-time approach to optimizing cost and revenue growth in the cloud.

 

Presented by:

  • Manav Doshi, GM, Technology Solutions, Equifax 

Transport for NSW is the winner of the 2022 TBM Council Award for TBM Pacesetter, which recognizes significant progress and value with TBM in a relatively short period of time. In this session, hear how the merger of Roads and Maritime Services (RMS) and Transport for New South Wales resulted in the fastest consolidation of TBM data, models, and reports into a single TBM practice. Hear from Poonam Kataria, Sr. Manager of TBM, as she shares how TBM is driving Transport’s three key strategic outcomes: connecting a customer’s whole life; successful places for communities; and enabling economic activity.

Session topics will include: 

  • Utilizing the TBM Taxonomy to align M&A practices and drive behavioural change 
  • How the right level of support sets the right culture and TBM processes
  • Driving change in the organization based on data-driven facts

Presented by: 

  • Poonam Kataria, Sr. Manager, TBM, Transport for NSW 

Discuss how TBM supports visibility of investments across the enterprise to support setting best practices and standards for managing the impact of environmental, societal, and governance strategies by IT departments and organizations.

The TBM Council Standards Committee has built out TBM integration models with other IT disciplines, including Enterprise Agile and Product Thinking, as well as ServiceNow CSDM. Current findings will be shared to drive group discussion, experience, and feedback. 

Public cloud strategies are often embraced for the promise of rapid scalability, on-demand agility, and best-in-class security, resiliency, and features. However, public cloud adoption presents significant financial challenges that, when not addressed, inhibit any firm’s ability to exploit the promises of public cloud.  

To address these challenges, customers need to simultaneously resolve current inefficiencies and build capability to ensure avoidance of waste in the long term.  

In this session we discuss a detailed framework combining TBM-Cloud with FinOps, allowing customers to understand how to implement a program to overcome these challenges and financially succeed in the cloud. 

Session discussion topics include: 

  • A detailed view of the activities required to implement a TBM-Cloud with FinOps Journey 
  • Detail the flow of information required for each task 
  • Provide guidance on which activities should be performed when

 

Presented by:

  • Nathan Besh, TBM-Cloud Evangelist, TBM Council 

Project to Product Transition

Outcome-focused development via agile transformation

For organizations looking to transition from projects to products, TBM can help organize resources and outcomes into value streams – the specific sets of activities that align to business outcomes.

Accelerating Cloud Adoption

Drive measurable outcomes with your cloud strategy

For organizations trying to accelerate their cloud journey, TBM provides a way to map a plan and measure the outcomes from cloud migration to cloud cost management to cloud optimization.

Morning Sessions

A look back at 10 years of TBM leadership and community building.


Speaker:

  • Ashley Pettit, SVP & CIO, State Farm Insurance

Introduced more than 10 years ago, Technology Business Management (TBM) was born out of the need for CIOs to have a management system to drive their technology operating strategy. At its core, the TBM discipline gives visibility into technology spend to provide common ground and enable a collaborative partnership across teams for prioritizing resources and achieving business outcomes. In this session, the TBM Council Standards Committee Chair, Atticus Tyson will share how over the past few years TBM has evolved to ensure leaders are able to accelerate digital initiatives, embrace the cloud, and communicate today’s complex technology landscape. TBM enables organizations to frequently and quickly evaluate projects, platforms, and investments to address the needs of the modern enterprise.


Speaker:

  • Atticus Tysen, SVP Product Development, Chief Information Security & Fraud Prevention Officer, Intuit

Atticus Tyson and Phil Alfano will guide the group through an executive discussion to capture “What is digital success to you?”. Is it how your organization creates new business capabilities? The elimination of legacy processes and systems? Funding innovation? Or all of the above as long as it drives an improved customer experience? Discuss with your table mates, as an overall group, and capture learnings and takeaways to bring back to your own team.


Speakers:

  • Atticus Tyson, SVP Product Development, Chief Information Security & Fraud Prevention Officer, Intuit
  • Phil Alfano, Field CTO, Apptio

How does a 170-year-old financial institution deliver a new, fully modernized technology strategy while supporting 24×7 service to their customers across a multitude of platforms, including point-of-sale, mobile, and web services? Mike Brady, Nicole Holmes, and Chad Schmidt will share how at Wells Fargo, they are creating a Technology Infrastructure team founded in the TBM discipline and responsible for aligning with internal partners to adopt an automation first approach for accelerating the delivery of services and deploying enhancements at speed. All while remaining compliant, secure, and agile.


Speakers:

  • Mike Brady, EVP, Technology Infrastructure, Wells Fargo
  • Nicole Holmes, EVP, CFO for Technology, Wells Fargo
  • Chad Schmidt, SVP, Technology Finance Modernization, Wells Fargo

It’s been two years since the World Health Organization declared Covid-19 a global pandemic. To re-imagine employee and customer experiences, every company was forced to speed up their shift to digital from multi-year project plans to instead creating, executing, and delivering new business models in a matter of weeks. As we emerge from this crisis, we recognize this shift is not slowing down but exponentially increasing as businesses continue to respond to societal expectations of anytime, anywhere. In this session, Sunny Gupta will share how the companies best positioned to quickly respond to changing market conditions and hyper competition have a holistic view of their technology spend so they can be agile in their investment decisions, use the cloud as a competitive advantage, and align their resources to product delivery models and continuously measure value.


Speaker:

  • Sunny Gupta, Co-Founder & CEO, Apptio

Afternoon Sessions

Spinning up a cloud-native posture is a desired strategy for many organizations, however few have the time, resources, and budget to achieve 100% public cloud operations. In 2018, Equifax set a 5-year goal to achieve this, striving to provide their customers with faster innovation, more flexible business agility, and stronger cybersecurity. Hear from RJ Hazra, SVP & CFO, Technology on the lessons and successes the Equifax team has found along their journey, and what remains as they cross into their final year of their company-wide digital transformation.


Speaker:

  • RJ Hazra, SVP & CFO, Technology & Security, Equifax

The cloud is a significant shift in computing and companies need to get maximum value from it. FinOps is the evolving cloud financial management practice that empowers organizations to track and maximize cloud spend and enable tech, finance, and business teams to collaborate on data-driven spending decisions. In this talk, J.R. Storment, Executive Director of the FinOps Foundation will explore the intersection between TBM and the FinOps practice and the benefits achieved. Session discussion topics include: 

  • Creating a culture of ownership over cloud usage and spend
  • The most important challenges to tackle for delivering products faster while gaining financial control and predictability
  • FinOps organization structures in large and small organizations from the State of FinOps 2022 report

 


Speaker:

    • J.R. Storment, Executive Director, FinOps Foundation

In this engaging conversation, executive leaders will share both the challenges and best practices realized on their journey to embrace product-based innovation.

Session discussion topics include:

  • Achieving results as you shift from a projects-to-products innovation model
  • Maximizing CIO/CFO partnerships in this new paradigm
  • Building your innovation strategy around value streams, stable teams, and a high degree of customer centricity

Speakers:

  • John Wilson, VP, IT Costing & Performance Management, MetLife
  • Kaarina Bourquin, Director, Strategy & Portfolio Operations & Technology, The Standard
  • Moderated by Toyan Espeut, Chief Customer Officer, Apptio

Session abstract coming soon


Speakers:

    • Brendan Kinkade, VP, Build ISV, Technology & Hybrid Cloud, IBM
    • Moderated by Phil Alfano, Field CTO, Apptio Foundation

TBM empowers hundreds of decision makers with the facts they need to execute a digital strategy faster, without bias, and in alignment across business units. This includes technology consumers, service and application owners, LOB CIOs, enterprise PMOs, compliance leaders, budget coordinators, and many more. What are the fundamentals of developing and executing a successful TBM practice? In this session, experienced practitioners will share the lessons and foundations they’ve learned delivering business value for their organizations with TBM.

Session discussion topics include:

  • Fundamentals of proper support and sponsorship across key stakeholders
  • Demonstrating how and why TBM is core to strategy and a digital operating model
  • Developing, educating, and enabling your core team
  • Implementing or enhancing the necessary TBM processes

Speakers:

    • Jeri Koester, CIO, Marshfield Clinic Health System
    • Latrise Brissett, Managing Director, Global IT, Accenture
    • Leslie Scott, VP & CIO, IT Enterprise Services, Stanley Black & Decker