Texas Tech University System (TTUS) adopted Technology Business Management (TBM) to create a stronger economic view of technology than its existing financial structures could provide. The organization wanted better cost transparency and planning, defensible service costs, more efficient benchmarking, and eventually stronger support for showback, investment, and risk decisions.
Over the following year, those objectives developed at different rates. Key findings from the adoption include:
By August 2026, TTUS executives were encountering TBM externally from the perspective of an organization already practicing it, even as the team remained careful not to equate its progress among higher-education peers with the maturity of more established TBM organizations.
TTUS’s experience demonstrates an adoption developing through use. Useful capabilities became operational before every original objective was complete, while attempts to extend TBM revealed dependencies and changed the organization’s understanding of what it needed to build next.
When Keith Halman stepped into the role of Chief Information Officer for Texas Tech University System in 2023, he inherited an organization that was operationally stable but positioned for transformation. The mandate extended beyond maintaining systems and infrastructure. It included modernizing the IT organization’s structure, strengthening governance, and improving how technology value was articulated to executive leadership.
Texas Tech University System is not a single-campus institution. It is a public university system office that exists to coordinate, govern, and enable multiple institutions. Unlike a standalone university, the system office does not directly generate tuition revenue. Its technology organization supports enterprise contracts, shared services, cybersecurity, infrastructure, and administrative platforms across diverse campuses. That structure makes financial clarity more complex—and more consequential.
Technology spending was visible in aggregate. Budgets were built annually. Contracts were tracked. General ledger data was available. Yet those mechanisms were designed primarily for compliance and stewardship within a public-sector environment. They were not structured to explain the fully burdened cost of delivering a defined technology service, nor were they designed to tell a coherent economic story that connected labor, contracts, infrastructure, and benchmarking data into a unified view.
As Mr. Halman began advancing a broader modernization agenda, conversations with executive leadership, including the CFO’s office, increasingly returned to foundational questions. What does it actually cost to deliver a given IT capability? How does TTUS compare to peer institutions? Where are resources concentrated? And how confidently can those numbers be explained?
The organization maintained disciplined financial practices through its IT Business Office, but it lacked a standardized economic framework capable of translating accounting categories into service-level insight. The more leadership asked service-oriented questions, the more apparent the structural gap became.
Technology Business Management did not emerge as a reaction to failure or financial crisis. It emerged as a structural response to a growing expectation for clarity. Mr. Halman’s interest in TBM also predated his arrival at TTUS. Earlier exposure to the discipline had shown him the potential value of a common structure that could connect internal financial information with external industry comparisons. At TTUS, he saw an opportunity to apply that structure within a broader transformation of how technology was managed and discussed with leadership.
The objectives were correspondingly broader than simply implementing a cost model. TTUS wanted stronger cost transparency and budget understanding, a defensible view of service total cost of ownership, a foundation for showback or chargeback, easier and more consistent benchmarking, and better support for longer-range planning. Mr. Halman also saw the potential to connect technology economics more closely with investment and risk decisions.
Those objectives were related, but they were not interchangeable. A standardized financial structure might make external reporting easier without revealing the fully burdened cost of a service. Service costing required labor and shared-resource allocations that ordinary budget reporting did not. Showback depended on service costs being sufficiently trusted to present to consumers. Longer-range planning required information about future commitments rather than simply a record of actual spending. The adoption would ultimately develop along several trajectories because the questions TTUS wanted TBM to answer required different combinations of data, modeling, organizational participation, and management process.
Prior to exploring TBM, Texas Tech University System operated within financial structures optimized for public-sector accountability. Encumbrance-based budgeting practices ensured that commitments were tracked carefully against appropriations. Reporting systems were designed to satisfy state oversight and funding requirements. Vendor classifications and procurement rules introduced additional layers of financial governance. These mechanisms were effective for control and compliance. They were not built to reveal service economics.
As a system office serving multiple institutions, TTUS occupied a structural position that also complicated traditional technology cost analysis. Many higher-education benchmarking models rely on measures such as cost per student FTE or campus-level allocations. Those models do not translate cleanly to a centralized system office responsible for shared enterprise capabilities. Mr. Halman recognized that the organization’s structural identity made cost comparison more nuanced than it might be at a single-campus university.
Budgeting and reporting perspectives operated on different timelines as well. Internal planning relied heavily on encumbrances and forward-looking commitments tied to contracts and staffing decisions. External benchmarking exercises, including EDUCAUSE and Gartner surveys, relied on actuals. Both views were individually rational, but reconciling them required interpretation. Preparing benchmarking submissions meant translating internal account structures into externally recognized categories, creating recurring questions about definitions and cost classification.
Much of the analytical effort required to bridge those differences lived in spreadsheets. The IT Business Office worked to assemble data from general-ledger reports, contract repositories, and labor records. The data existed, but it was fragmented across systems. As leadership questions became more granular—particularly around service-level cost and labor attribution—the manual burden increased. The organization could answer many of the questions, but doing so required time, reconciliation, and knowledge that often resided with the people performing the analysis.
Labor visibility was especially limited. Personnel costs were recorded in the general ledger, yet staff effort was distributed across multiple services, applications, projects, and operational activities without a structured allocation mechanism. An engineer could support infrastructure, several applications, project work, and incident response during the same period. Accounting records could show where that employee was paid without revealing how the cost should be distributed among the services TTUS wanted to understand.
Vendor and contract information presented a related challenge. Contracts were managed responsibly, but they were not inherently connected to a defined service portfolio. Identifying the total cost associated with a service could require piecing together contract expenditures, labor, shared infrastructure, and other expenses manually. The information existed in some form, but the relationships among those records were not already modeled.
At the same time, Mr. Halman’s modernization agenda aimed to reposition IT increasingly as a portfolio of services and investments rather than a collection of expense categories. That shift required clearer service definitions, better alignment between financial information and service delivery, and a more consistent framework for comparing TTUS with peers. Incremental refinements to spreadsheets or account codes could improve individual analyses, but they would not resolve the underlying mismatch between compliance-oriented accounting and service-oriented management.
By mid-2025, the convergence of those pressures was becoming clear. The system’s structural complexity, the tension between encumbrance-driven planning and actuals-based reporting, the manual burden of translating information for benchmarking, and the desire for service-level transparency collectively pointed toward the need for a more durable economic framework.
The decision to adopt TBM therefore established a direction rather than a finished design. TTUS still had to determine what technology it could sustain, how much of the model it needed to construct, how existing financial and service structures would participate, and how a relatively small team could turn an implementation into an enduring management capability.
The decision to adopt TBM did not automatically determine which technology TTUS would use to support it. The team considered multiple options, including Apptio and Proven Optics, before selecting EZTBM. Affordability was an important factor in a public-sector environment where the expense of the TBM platform itself had to be justified, but price was only part of the decision. TTUS also considered implementation complexity, ongoing support, usability, and the amount of internal capacity required to operate the environment after the initial project.
Those considerations favored an approach the organization believed it could realistically sustain. EZTBM offered a comparatively accessible price point and an implementation arrangement that gave TTUS direct access to people who could help construct and troubleshoot the environment. Vendor personnel frequently worked alongside TTUS staff rather than making every change independently. By November 2025, Sandy Bagwell described a process in which vendor personnel demonstrated the work while TTUS staff increasingly performed uploads and changes themselves.
The operating burden mattered because TTUS was not planning to create a large team devoted exclusively to the platform. In December, Mr. Halman contrasted EZTBM’s manageable, incremental work with prior experience of more complex technology and said the team had been able to absorb the work without a full-time analyst dedicated solely to the tool. He also pointed to the speed with which TTUS had begun seeing contract and spending-line information as evidence that useful work could start before the entire model was complete.
That arrangement provided hands-on learning, but it did not eliminate the distinction between knowing how to operate a platform and understanding how to construct a technology-economic model. Loading a file or repeating an established process could become familiar relatively quickly. Deciding how labor should be allocated, where a service belonged in the model, how shared resources should be distributed, or what degree of reconciliation was necessary required a different kind of knowledge. Mr. Halman expected some methods to change as the team learned, and by November TTUS had already revised elements such as its general-ledger load and blended-rate methodology.
The provider’s implementation approach also influenced the order in which capabilities developed. In January, ITBMO described EZTBM’s methodology as intentionally fast-tracked around client priorities rather than dependent on completing every intermediary TBM layer before useful outputs could be produced. Financial actuals, contracts, budgets, and service-oriented work could therefore advance while other parts of the standardized TBM structure remained less developed.
TTUS did not interpret that sequencing as a decision to abandon those later layers. Resource Towers remained explicitly expected. In December 2025, Mrs. Bagwell said the team had not yet reached Tower mapping and described Towers as one of the platform’s selling points. By January, Mr. Halman expected the organization to move into that layer over the coming months. The immediate emphasis on financial data and service work reflected implementation sequence rather than a conclusion that standardized resource categorization had no value.
Service costing was also already beginning to expose the questions that would later dominate the adoption. By December, TTUS was experimenting with formulas, considering labor overhead, debating how shared platforms should be allocated, and trying to determine the appropriate level of its service catalog for assigning costs. Project work created another complication because expenditures associated with building a capability could eventually become part of the continuing cost of operating a service. These questions initially appeared to be matters of model construction, but they would eventually reach much farther into TTUS’s service structures and operating processes.
EZTBM itself remained a tradeoff rather than becoming either the hero or the obstacle of the case. TTUS encountered weaknesses in documentation, data-loading processes, and some forward-looking planning functions. More expensive products could offer capabilities the team did not have. Yet TTUS continued to regard the original decision as reasonable for its circumstances. By August, Mr. Halman could identify frustrations with the platform while questioning whether they justified abandoning a comparatively serviceable environment for a substantially more expensive alternative.
That continuity matters because it prevents later modeling difficulties from being reduced to a platform-selection story. Over the course of the adoption, TTUS did not discover that it had chosen the wrong product. Instead, it learned what different TBM capabilities required and distinguished among limitations of the software, limitations in source information and operating processes, and difficulties inherent in the economic questions it was trying to answer.
TTUS began implementation with a relatively small group carrying much of the work. Mr. Halman provided executive sponsorship and remained unusually engaged in the conceptual and technical questions that arose. Mrs. Bagwell and the IT Business Office brought the financial expertise required to reconcile budgets, contracts, and actuals. Other TTUS staff contributed expertise in data, service management, infrastructure, applications, procurement, and operational processes, while the CFO organization became an important stakeholder in decisions about how financial information should be represented and used.
The organizational structure around TBM was initially less mature than many of the financial processes feeding it. TTUS did not begin with a large dedicated TBM office, a complete set of governance routines, or every responsibility and operating procedure already defined. Instead, those mechanisms accumulated as implementation created the need for them. The Program and the model developed alongside one another.
Recurring data operations were developing at the same time. In late 2025, actuals were still being loaded manually, and TTUS was establishing a monthly process around the close of the prior financial period, using a shared transfer location and local technical support to make the load repeatable. By February, the team had successfully tested an automated actuals load. The test did not eliminate reconciliation: source-system and procurement limitations still required post-upload manipulation, and the process exposed product issues that the provider subsequently corrected. The result was a repeatable operating path rather than a fully hands-off interface.
Knowledge transfer became an early priority. Vendor support allowed TTUS to make progress despite limited internal TBM experience, but the organization did not want recurring work to remain dependent on calls with the implementer. By late 2025, the team was discussing a playbook that could capture roles, responsibilities, and repeatable processes. By February 2026, the concept had evolved into a growing collection of training materials and videos documenting how particular problems had been solved. The team found vendor documentation insufficient in some areas, although it also credited the provider with responding quickly to bugs and requested product changes.
The playbook concept continued to mature as financial processes became more repeatable. TTUS began developing its own standard operating procedures for budget work, contracts, vendor management, and other activities, often incorporating screenshots, approval steps, and practical instructions reflecting the environment the team had actually built. By April, the team was considering how internal change-management expertise could help strengthen that documentation. By May, the team was writing procedures and guides specifically so knowledge would not remain confined to the people who had worked most closely with EZTBM.
Stakeholder participation developed more gradually. Cost-center owners received training on TBM concepts and the platform, but TTUS had not yet determined how much direct model control should be distributed. Broad access could create consistency problems if many managers changed assumptions or structures independently, while a highly centralized approach risked disconnecting the people accountable for spending from the forecasts and explanations being created on their behalf.
The organization increasingly separated meaningful participation from direct platform operation. Cost-center owners could contribute forecasts, explain variances, review commitments, and discuss spending assumptions even if the core team retained responsibility for maintaining the model. In April, TTUS planned to work through the FY27 budget directly with cost-center owners rather than relying on automated notifications and expecting managers to enter information independently. That approach reflected the complexity of public-sector budget adjustments and the team’s recognition that adoption involved more than simply issuing user accounts.
By the summer, reporting expectations were becoming part of a broader business-engagement model. Managers were increasingly responsible for the quality of information associated with their areas and were being drawn into discussions about their metrics. Direct use of EZTBM by cost-center owners remained limited. By August, Mr. Halman described them as essentially waiting for TTUS to give them the “green light” for broader participation. Quarterly reporting with the CFO had begun, and the team expected managers to become more involved in forecasting as the cost and service models matured. The management process around the information was therefore expanding beyond the original implementation group even though platform operation remained concentrated.
Formal TBM governance remained less developed. In May, TTUS reported that regular governance forums and review cadences using TBM outputs had not yet been established and that there was not sufficient business-owner interest to support a dedicated TBM governance board. That condition is important because it prevents the case from portraying Program establishment as more complete than it was. At the same time, operating capability had accumulated in other forms. The team could manage contracts and variances with increasing independence, was documenting its own procedures, and believed enough knowledge had spread that the capability would not simply disappear if one of the original leaders left.
The amount of organizational effort invested in TBM therefore extended well beyond configuration of EZTBM. Staff were learning a new economic vocabulary, reconciling data, developing repeatable financial processes, training managers, documenting procedures, testing labor collection methods, and working with the vendor on model structures that did not have obvious answers. The work competed with ordinary responsibilities such as annual budgeting, hiring, and organizational changes, which periodically affected the pace of implementation. Looking back in August, Mr. Halman estimated that an organization of comparable size and scope should expect two or three people to contribute to TBM even if none were dedicated to it full time, and he emphasized that preparing and interfacing source data had required more manual effort than TTUS initially expected.
This Program-development story should not be treated as an explanation for every use-case difficulty. The absence of a formal governance board, for example, does not establish why labor tracking or service costing proved difficult. The more useful observation is that TTUS gradually accumulated the organizational capability needed to sustain TBM while the use cases themselves created new demands for ownership, participation, documentation, and expertise.
That pattern would become increasingly visible as the adoption moved from loading financial information into the environment toward using it in recurring management processes.
The first substantial evidence that TBM could produce practical value at TTUS came from capabilities conceptually closer to the organization’s existing financial strengths. Even there, implementation required more than loading a general ledger into a new platform. TTUS’s public-sector budgeting environment, contract structures, and use of encumbrances meant that the financial view managers needed did not map automatically to the assumptions of a conventional planning model.
An annual budget establishes spending authority, but management decisions depend on understanding when expenditures are actually expected to occur. Contracts can span multiple years and produce payments at particular points in the year. Labor follows another pattern. Travel, office expenses, and other discretionary categories may exist as annual amounts without a meaningful monthly schedule. Dividing every annual budget evenly across twelve months can therefore create variances that reflect the planning method rather than actual management performance.
TTUS began addressing that problem by connecting known commitments with the budget. Contracts became especially useful because they could establish when recurring expenditures were expected, creating a more realistic baseline for expected-versus-actual analysis. Less predictable categories required different assumptions and greater involvement from cost-center owners.
The process also forced TTUS to reconcile its internal financial perspective with the way EZTBM represented the data. In December, actuals and encumbrances did not always align with the budget view in ways the team initially expected. Rather than treating the discrepancy simply as a technical defect, the team worked through what each source represented and how the planning model should interpret commitments that had not yet become actual expenditures. This was part of a broader learning process in which the team had to distinguish the official accounting record from the management view it wanted TBM to provide.
By March, the organization was using the environment to support the next budget while acknowledging that some components, particularly labor, were still incomplete. Mr. Halman described the ability to represent the budget and its application of costs with greater specificity as a significant improvement over the visibility available elsewhere in the system. He also recognized that useful forecasting required TTUS to become more deliberate about when spending was expected rather than relying on annual totals.
That change required new participation from managers. For expenses without contractual timing, cost-center owners were better positioned to explain when spending was likely to occur. TTUS therefore began moving toward a process in which those owners would participate in the forecast and discuss assumptions with the central team. A travel budget, for example, might not be spent evenly across twelve months, while contract invoices could arrive earlier or later than the schedule assumed. By May, Mrs. Bagwell described using dashboard notes to document why actual spending differed from plan and correcting contract timing when necessary. The change was as much managerial as technical: a useful forecast required people responsible for spending to think explicitly about the timing of that spending and to explain meaningful variances when they occurred.
By April, TTUS had finalized its FY26 budget in the environment and was beginning to build FY27, FY28, and FY29 around current and future commitments. Budgeting and planning had become sufficiently repeatable to be considered operational even though the team continued refining procedures, forecasting assumptions, and owner participation.
The capability did not turn EZTBM into a comprehensive enterprise-planning system. Mrs. Bagwell later observed that the platform did substantially more than TTUS had previously been able to do while still leaving room for improvement, and Mr. Halman described some of its forward-looking functionality as limited. The value lay in the management view TTUS had created: actual expenditures, contractual commitments, labor, and other planning assumptions could increasingly be considered together rather than reconciled manually after the fact.
That distinction also became important when Mr. Halman later described TBM as operational. He did not mean every intended use case had reached completion. He meant TTUS had established recurring capabilities around current expenditures and financial management that were already changing how the organization worked. By August, Mr. Halman described that operating state more concretely as a business cycle around data management, expected-versus-actual analysis, variance analysis, and service modeling, with some of those capabilities demonstrated but still needing to scale.
Contracts entered the model primarily as a financial input. The work required to make them useful soon revealed how fragmented the underlying information had been.
Contract terms, vendors, dates, manufacturers, and future commitments existed across systems and spreadsheets that did not always agree. In December, TTUS was reconciling discrepancies between EZTBM and its existing contract records while working through a recurring problem in which procurement data identified a reseller without clearly identifying the underlying manufacturer. EZTBM added a field that could capture manufacturer information manually, but the workaround created a new question about how TTUS would populate the information consistently without introducing another recurring manual process.
The immediate implementation response was data cleanup. The longer-term response increasingly involved the processes that created the data. If procurement records did not contain the information needed for technology-economic analysis, reconstructing it every month inside TBM would leave the underlying problem intact. By February, the team was discussing the need for more disciplined recordkeeping before transactions entered the downstream process.
As the information improved, the contract repository began answering questions beyond the original data-loading requirement. Known commitments could be incorporated into future budgets. Renewal timing became more visible. Vendor relationships could be examined more coherently. By April, Mrs. Bagwell explicitly described contract management as a goal that had emerged during implementation rather than merely a prerequisite for another use case.
By May, TTUS considered normalization of its existing contract information substantially complete. The team could export and use the repository readily for budgeting and forecasting and was beginning to consider how the capability might support more proactive procurement and vendor-management practices.
Those ambitions extended beyond what TTUS had put into operation by the end of this period. TTUS discussed improving vendor lead times, renewal planning, and coordination with the broader procurement organization, but organizational politics and capacity constraints slowed some of that work. The case therefore does not support claiming that TBM transformed procurement. It does support a narrower and still significant conclusion: contract information that had previously required reconciliation across multiple sources became a normalized management dataset capable of supporting budgeting, forecasting, renewal visibility, and broader conversations about vendor spending.
Contract management also illustrates why the adoption cannot be judged only against the original use-case list. It was not initially the centerpiece of the TBM business case, yet it became one of the strongest operational capabilities produced during the first year. By August, Mrs. Bagwell identified contracts among TTUS’s strongest outcomes, alongside the financial-analysis capabilities Mr. Halman emphasized.
Benchmarking developed differently. It had been an explicit objective from the beginning because TTUS’s structure made external comparison difficult. The system office did not fit neatly into metrics designed for individual universities, and translating internal financial information into categories used by organizations such as EDUCAUSE and Gartner required substantial manual work.
Early in the implementation, TTUS aligned portions of its financial categorization with externally recognizable structures. In November, Mr. Halman reported a concrete result: an EDUCAUSE Core Data exercise that had previously taken roughly a couple of weeks could be completed in about an hour after the underlying categories had been aligned. The output still depended on the quality of the underlying information, particularly labor, but the reduction in translation effort demonstrated why standardization had been attractive in the first place.
The example should not be stretched into evidence that TTUS had established a mature benchmarking capability. The organization had not yet completed its standardized Resource Tower view, and questions persisted about how a system office should be compared with peers. What the result demonstrated was narrower: useful standardization could reduce recurring analytical effort before every part of the intended TBM model was complete.
The experience would become especially relevant later when TTUS struggled with Resource Towers. The early benchmarking benefit showed that standardization already had practical value, but it did not answer how far TTUS needed to develop the standardized resource layer or how that layer should relate to the service-oriented model taking shape elsewhere.
By early 2026, these financial capabilities were beginning to change the character of the adoption. TTUS had entered TBM with service costing and showback among its visible ambitions. Yet budgeting, contracts, actuals analysis, and early standardization were becoming useful while the more complicated service and labor work remained unfinished. Rather than delay use until every original objective matured, TTUS began incorporating those capabilities into recurring management and continued building the others alongside them.
Service costing remained one of TTUS’s most important original objectives because it promised to connect financial information with the services technology actually delivered. A defensible total cost could support showback or chargeback, strengthen investment decisions, and give leadership a more coherent explanation of why technology spending existed. As TTUS moved from high-level financial visibility toward fully burdened service economics, however, the team discovered that the capability depended on much more than accounting data.
By December, the organization was already experimenting with service-cost formulas and encountering decisions that had no obvious answer. Labor overhead could be represented through blended rates, but shared platforms such as ServiceNow supported multiple activities simultaneously. Allocating those costs required assumptions about consumption or contribution. Project work could eventually become part of a production service, but TTUS needed a method for distinguishing temporary investment from continuing operations. The service catalog itself raised questions about which level should receive costs and which level should remain the customer-facing representation of what IT delivered.
At first, these issues still looked primarily like model-design questions. Labor allocation would reveal how deeply they reached into the organization.
Personnel costs represented a significant share of technology spending, yet the general ledger could show where an employee was paid without revealing how that person’s time was distributed among services, applications, projects, and operational work. TTUS initially addressed the gap pragmatically. Service and application owners provided estimated percentage allocations, giving the team enough information to begin modeling while acknowledging that the numbers were provisional.
By February, a first pass had been loaded using what the team openly called “guestimates.” The approach was useful because it allowed the model to move forward without waiting for a sophisticated operational time system. It was not intended to be the final answer. TTUS wanted better evidence of where employee capacity was actually being consumed.
The organization therefore began developing a more systematic effort-tracking process. A pilot was completed, and broader rollout was prepared. The team was sensitive to employee reaction because conventional language around timesheets or time tracking could imply attendance monitoring rather than capacity analysis. Framing the exercise as “effort allocation” helped communicate that the objective was to understand where work was going, not whether an employee had accounted for every minute of a forty-hour week.
That communication appeared to work. Employees asked questions, but the initial discussions did not produce the organized resistance the team had feared. At the same time, the pilot began exposing a different issue. The service catalog had seemed adequate until employees were asked to allocate effort against it. In February, the team encountered the example of a person performing critical data-center work whose responsibilities did not fit naturally into the existing service definitions, forcing it to consider whether the activity represented another service, a shared capability, or overhead.
The problem became more visible as TTUS moved from estimates toward operational data. Employees did not necessarily describe their work using the same categories the model expected. Some associated effort with the application or tool they touched rather than with the service outcome that work supported. Others worked across categories that did not map neatly to the structure available in the tracking process.
In March, TTUS had payroll-budget information and new effort data, but the relationship among that information, services, and projects was not yet mature enough to support all of the decisions the team wanted to make. The data existed, but existence and analytical usefulness were not the same thing. The organization still needed to determine how the information should be integrated, how managers would interpret it, and how the resulting allocations should participate in service costing.
By April, the effort-tracking rollout appeared to have overcome one of its largest organizational risks. TTUS described implementation as successful and relatively quick, crediting management with explaining the “why” behind the new process and using simplified categories in ServiceNow. The organization had moved beyond provisional estimates and had a mechanism through which employees could report how their effort was distributed.
At the same time, the first pass was generating issues that required cleanup. Employees were still learning how to categorize their work, and TTUS was learning how the information could be extracted and related to the model. Those qualifications did not initially overturn the positive assessment. From the perspective of rollout and participation, the process appeared to be working.
The assessment changed substantially by May. TTUS now reported that labor-allocation tracking was not working adequately. The rapidly deployed process had produced incomplete information, staff continued to ask questions about classification, and the service catalog had not been integrated in a way that made the resulting allocations sufficiently trustworthy. The team also acknowledged a more fundamental problem: it had entered the exercise without defining the finished capability clearly enough.
The April-to-May reversal preserves an important distinction in the adoption. The rollout initially appeared successful because TTUS had solved enough of the communication and participation problem to get people using the process. Only after the resulting information was evaluated against its analytical purpose did the deeper weakness become apparent: operational adoption and analytical adequacy were different tests.
The service catalog increasingly became central to the reassessment. TTUS had not entered TBM intending to undertake a major service-management remediation exercise. The catalog already served an organizational purpose. But a catalog that works as a customer-facing inventory does not necessarily contain the relationships required to function as a costing architecture.
Service costing placed new demands on the structure. Applications, tools, technical components, and customer-facing services could not simply be treated as interchangeable objects if costs were expected to move through them in a defensible way. A platform such as ServiceNow might support ticketing, asset management, project management, and other capabilities while contributing to several services. Infrastructure components could support many customer-facing outcomes without themselves being the service a stakeholder recognized.
As TTUS worked through those relationships, the team began separating technical building blocks from higher-level offerings. The catalog was simplified in some places and restructured in others so that lower-level components could contribute to recognizable services without being mistaken for those services.
By May, the response had already moved back into TTUS’s source service-management environment. The team was revisiting ServiceNow to address weaknesses in the catalog, and staff were being sent to ITIL training; Mr. Halman expected additional changes in how TTUS distinguished applications from services. By June, this refactoring had become a substantial workstream. Mrs. Bagwell described the service work as one of the most significant areas of organizational learning produced by the adoption. Her team had entered with strong knowledge of the financial side but had needed to develop a better understanding of the other layers and of the “why” behind the TBM framework.
Mr. Halman described the same challenge from the perspective of model design. It was difficult to separate what the platform could represent from where TTUS ultimately wanted the model to go. The problem was no longer simply how to configure EZTBM. TTUS was learning how its own services, applications, technical components, labor, and costs related to one another.
Labor and service costing had consequently become a recursive problem. Better labor information was necessary for stronger service costs, but collecting better labor information required employees to associate their work with meaningful services. Attempting that association exposed weaknesses in the service structure. Changing the service structure then altered the categories against which labor should be allocated. Effort tracking had not merely been blocked by an inadequate catalog; attempting effort tracking helped reveal why the catalog was inadequate for the analytical use TTUS was pursuing.
The deeper TTUS moved into service costing, the more often it encountered a second recurring question: how much accuracy was necessary for the decision the organization wanted to support?
Shared technologies illustrated the problem. A platform used by several services could theoretically be distributed through increasingly sophisticated allocation drivers, but every additional driver required data that had to be collected and maintained. Bundled software agreements created another challenge because a single enterprise contract could contain several products without exposing a clean component price. Assets raised questions about depreciation, purchased versus leased equipment, and older infrastructure whose accounting treatment did not necessarily correspond neatly with its continuing operational role.
Labor involved the same tradeoff. Managerial estimates were easier to maintain but less precise. Operational effort tracking could create richer information, but only if employees participated consistently, services were defined appropriately, integrations worked, and the organization was willing to sustain the process.
TTUS did not respond by deciding that precision was unimportant. The team continued trying to make allocations defensible and improve the quality of the underlying information. What changed was the assumption that maximum detail should automatically be the goal. By July, Mr. Halman was applying that reasoning explicitly to unitization, considering whether more granular measures of consumption would produce enough additional decision value to justify the effort required to create them.
That shift represented an important maturation in the adoption. Questions that had begun as “How do we model this?” increasingly became “How accurately do we need to model this for the decision we are trying to make?” The distinction mattered because every allocation rule, manual field, data feed, and reporting process created during implementation would eventually become something the operating Practice had to maintain.
The service and labor work also reinforced a pattern first visible in contracts: some apparent TBM data problems originated in the processes that created the data.
Early in implementation, missing or inconsistent information naturally appeared as something the TBM team needed to fix after ingestion. Vendor and manufacturer information had to be reconciled. Financial records needed contextual interpretation. Labor classifications required cleanup. The model could compensate for many of these deficiencies, but repeated downstream correction risked turning TBM into a permanent reconciliation function.
By February, the team was already pursuing more anticipatory recordkeeping in procurement and other processes. The automated actuals-upload test had worked, but post-upload manipulation remained necessary because the source environment did not always contain the information in the form the model required. TTUS described TBM as creating value partly because it prompted greater discipline in business practices before data reached the platform.
By April, the team was explicitly describing upstream process cleanup and reengineering as part of the work. The model was exposing places where information needed for service costing or planning did not exist in the required form, and the response increasingly extended beyond EZTBM configuration.
The effect was still visible in July. Mr. Halman and Andrew Ruiz discussed data-integrity problems associated with aging systems and historical practices, while TTUS implemented quality controls and shifted greater responsibility to managers for the information associated with their areas. They also recognized that general-ledger codes alone did not provide enough context to understand every technology purchase, making staff involvement in invoice and contract processes important to the quality of the eventual analysis.
The case does not establish that TBM permanently transformed enterprise data quality. Source limitations remained. What changed was where TTUS increasingly looked for the solution. If a field repeatedly had to be reconstructed after ingestion, the organization began asking whether it could be captured correctly at its origin. If employees repeatedly categorized work in ways inconsistent with the model, the team examined both the reporting process and the service structure. TBM became a mechanism for discovering weaknesses in the processes feeding it rather than simply a place where imperfect data was repaired.
None of this meant TTUS had abandoned service costing. The organization continued developing the capability through the summer, but progress was affected by the same finite capacity facing the rest of the technology organization. In July, Mr. Halman reported that TTUS had not reached the service-costing milestone it had previously expected because the budget cycle, hiring activity, retirements, and other organizational priorities had redirected attention. Service-catalog work paused while the team addressed those demands.
The delay is useful context but should not be mistaken for the explanation of the entire trajectory. Even with unlimited staff time, TTUS still would have needed to work through service definitions, labor, shared costs, assets, and allocation choices. Competing priorities affected pace; they did not create the conceptual problems the team was discovering.
By August, TTUS had proved important elements of the service-costing concept and had a clearer understanding of the structures required to extend it. Mr. Halman included service modeling within the business cycle TTUS had demonstrated, while also emphasizing that it still needed to scale. The capability had not reached the same recurring operational state as budgeting or contract management. Labor allocation likewise remained an area of continuing development rather than a stable source of trusted service-cost information.
Showback followed the consequences of that development. It had been part of the original rationale for creating defensible service costs, but broad showback requires confidence in the costs being presented. While service definitions, labor allocations, shared costs, assets, and other components of TCO continued to mature, TTUS did not move prematurely into broad operational showback. The original objective remained visible, but its path now depended on work that had proved more complex than the organization initially expected.
The service-costing journey therefore produced two kinds of results. It had not yet produced a fully mature operational capability, but attempting to build it substantially changed TTUS’s understanding of its services, labor, source processes, and modeling requirements. In a longitudinal adoption case, that learning is not a substitute for the unfinished outcome. It is part of what happened while the outcome was still being developed.
As TTUS reconsidered its service structure, another modeling question was developing alongside it: how should that organization-specific service view relate to the standardized resource structure of the TBM Taxonomy?
The distinction matters because Resource Towers and services describe different dimensions of technology economics. Cost Pools identify the financial nature of spending. Resource Towers and Sub-Towers organize the technology resources and functions that spending supports. Services or Solutions organize the products and capabilities those resources ultimately help deliver. A service can therefore draw on resources represented across several Towers, while a Tower can contribute to many services.
TTUS did not begin the adoption intending to disregard the standardized resource view. In December 2025, Mrs. Bagwell said the team had not yet reached Tower mapping and described Towers as one of the selling points that had attracted TTUS to the platform. In January, Mr. Halman expected the organization to move into that layer over the following months. The fast-track implementation simply allowed other work to proceed first.
That sequencing became more consequential because the service-oriented model was becoming useful before the Tower view was fully developed. TTUS could analyze actual expenditures, build budgets, manage contracts, and begin assigning costs toward services without making Resource Towers the organizing foundation for those capabilities.
By June, Mr. Halman could see more clearly what the implementation had produced. While looking for what he called the “cost towers,” he realized that EZTBM was effectively creating several representations of the environment. One dataset supported analysis of actual financial expenditures. A second allocated costs against the service catalog and served as the basis for service-oriented modeling. A third represented the broader standardized TBM categorization. “The service catalog became the modeling basis,” he explained, “not the TBM framework model.”
The realization clarified the model TTUS had developed while progressing without making Resource Towers integral to its service-cost model. It also created a new conceptual question. If the local service structure already provided a useful language for explaining costs internally, what additional purpose should the standardized resource view serve?
TTUS continued pursuing that question rather than concluding that Towers were unnecessary. By August, Mr. Halman was spending substantial time trying to map Cost Pools into Towers and finding the relationship difficult to apply. A financial category does not automatically reveal the technical resource an expenditure supports; making that assignment can require information about cost centers, organizational ownership, contracts, vendors, technologies, and other context.
The challenge was compounded by the fact that TTUS’s service model had already become more familiar. At one point, Mr. Halman wondered whether the local service catalog might effectively supplant the Taxonomy in the model. That comment provides useful evidence of how unresolved the relationship remained, but the case does not need to characterize it as an individual’s confusion. The more important development is what followed. Discussion of the two perspectives helped clarify that services and Towers answered different questions, and Mr. Halman continued to see value in standardized resource modeling rather than dismissing it.
He described the service catalog as the language through which TTUS could visualize how its operations worked. Resource Towers, by contrast, remained useful for organizing technology resources into standardized categories, particularly when the organization wanted to compare itself with others or examine the underlying technical structure of its spending.
The available evidence does not establish that EZTBM caused TTUS’s difficulty understanding or applying the relationship. The provider maintained that the platform supported the TBM Taxonomy while deliberately accelerating initial work around client priorities. TTUS was also working through Taxonomy changes, limited educational material, internal service-model questions, and the inherent complexity of translating accounting information into technical-resource categories. The implementation sequence clearly shaped the order in which the team encountered these concepts, but attributing the later difficulty to a single cause would exceed the evidence.
The earlier benchmarking result helps illustrate why the distinction became important. TTUS had already standardized enough financial information to reduce the effort required for an EDUCAUSE exercise dramatically even though its complete Tower model remained unfinished. That demonstrated that some benefits of standardization could be obtained without first constructing the entire resource view. It did not demonstrate that the resource view had no additional analytical value.
Indeed, TTUS’s continuing interest in Towers suggests the opposite. Standardized resource categories could support forms of technical cost analysis and benchmarking that a locally defined service catalog could not provide in the same way. Services could be recognizable to internal consumers precisely because they reflected TTUS’s own operating environment; Towers could be useful precisely because they imposed a more standardized perspective.
The coexistence of these views became one of the more sophisticated lessons emerging from the adoption. The organization did not need to choose between describing technology in standardized industry categories and describing it through services meaningful to its own stakeholders. The challenge was understanding what each representation was intended to accomplish and how much effort each deserved.
That final question connected the Tower work with TTUS’s broader learning about precision. By August, Mr. Halman still considered the resource view valuable, but he was also explicit about the need to determine when additional modeling effort would produce sufficient return. The question was no longer simply whether TTUS could complete another layer of the model. It was what decision that layer would improve and whether the organization was prepared to sustain the information required to keep it useful.
For organizations considering whether they need Resource Towers, the TTUS experience therefore provides evidence without supplying a universal answer. TTUS demonstrated that useful financial and service-oriented capabilities can become operational before Tower mapping is complete. It also demonstrated that doing so does not make the analytical purpose of standardized resource categorization disappear. The significance of the resource layer depends partly on the questions an organization ultimately expects its TBM Practice to answer.
By the middle of 2026, TTUS had not completed every original objective, yet the questions being asked of TBM were already expanding. This apparent contradiction is one of the more revealing aspects of the case. The organization did not wait for service costing, labor allocation, and Resource Tower mapping to reach a final state before considering what its growing technology-economic capability could support next.
Project costing was one of the first extensions. The issue had surfaced earlier because development work eventually transitions into ongoing services, creating a need to distinguish temporary investment from recurring operational cost. By April, TTUS was working through how maintenance should be separated from new project activity and how project information would need to be structured so it could eventually participate in the model.
The capability remained less mature than budgeting or contract management, but its emergence changed the scope of the economic conversation. TTUS was beginning to connect what it spent to why it was spending it and whether that expenditure represented sustaining an existing capability or creating a new one.
Mr. Halman’s portfolio roadmap extended the thinking further. The objective was to connect technology lifespan, strategy, investment requirements, and the existing cost base so leadership could consider not only what technology currently cost but what would need to be sustained, replaced, or changed over time. In May, he identified the portfolio document as one of the next significant opportunities after TTUS had established greater control over current expenditures. By July, the roadmap had been submitted to the president for feedback. By August, Mr. Halman said TTUS had used the portfolio during the year and was incorporating portfolio thinking into a joint strategic-planning process with the CFO division. It had not yet become a fully mature recurring TBM use case, but the trajectory had advanced beyond creation and submission of a roadmap toward use in broader planning.
Assets introduced another dimension into that work. TTUS had to consider how purchased and leased equipment should appear in the model, how depreciation should be represented, and how older infrastructure should participate in a technology-economic view when its accounting treatment did not necessarily reflect its continuing operational significance. These questions remained part of the developing model rather than becoming a separate use case, but they illustrate how moving from expenditure reporting toward investment economics created additional requirements.
Enterprise risk introduced a further extension. Mr. Halman had connected TBM with risk and investment justification from the beginning, but by summer the concept was becoming more concrete. TTUS began working with the CFO organization and Enterprise Risk Management to consider how the financial impact of technology downtime might be represented.
The university environment made a simple annual value inadequate. An outage on the first day of classes could have dramatically different consequences from an outage during a low-activity holiday period. Cybersecurity risk could follow another pattern, with exposure and impact varying differently across the calendar. TTUS therefore began considering a methodology capable of distinguishing different kinds and timing of impact rather than applying one uniform value to every hour of downtime. By August, Mr. Halman still considered the use case meaningful but no longer assumed the complete methodology belonged inside EZTBM. He expected multiple tools to contribute, with TBM supplying part of the economic information needed for the analysis.
These efforts remained emerging applications rather than demonstrated outcomes. Their significance lies in what they reveal about the direction of the Practice. TTUS had begun the adoption largely focused on making technology costs more understandable. It was now considering how the same economic foundation could inform decisions about technology lifecycle, portfolio investment, and risk tolerance.
The organizational capability surrounding TBM was maturing at the same time. By May, Mr. Halman believed the effort had crossed from implementation project into operational capability because TTUS could manage current expenditures, particularly contracts, through recurring processes. The team was increasingly self-sufficient in those areas even while still relying on the vendor for more sophisticated model work.
By August, Mr. Halman described that operating state more concretely as a defined business cycle encompassing data management, expected-versus-actual analysis, variance analysis, and service modeling. TTUS had demonstrated those capabilities, in his assessment, even though some still needed to scale. That distinction helps reconcile the organization’s description of TBM as operational with the unfinished state of labor allocation, service costing, Resource Towers, and showback: operational meant that repeatable TBM-supported management work existed, not that every intended capability had reached maturity.
That judgment did not imply that every original objective had been achieved. Service costing remained the largest unfinished area. Labor allocation was not stable. Resource Towers were still developing. Formal TBM governance was limited, and cost-center owners were not routinely operating EZTBM themselves. “Operational” described a Practice with repeatable capabilities, not a declaration that adoption was complete.
Internal knowledge nevertheless had grown substantially. Procedures and playbooks reduced reliance on memory. Multiple people understood recurring processes. Managers were becoming more accountable for information. In August, Mr. Halman described the internal team as able to handle routine operations without regular vendor intervention while still expecting ITBMO support for more complicated forecasting, configuration, and modeling questions. Mrs. Bagwell also identified additional staff who understood where key information and processes resided, reducing dependence on any one individual.
By July, Mr. Halman’s frame of reference was beginning to shift outward. While discussing investment strategy, he described TTUS as operating near the leading edge of its higher-education peer environment. The comment was not evidence that TTUS had surpassed mature TBM organizations. It indicated that the team increasingly saw its work in relation to peers rather than solely as an implementation it was still learning to perform.
The strongest expression of that change came in August through the CFO’s experience outside TTUS. Mrs. Bagwell recalled the CFO returning from a conference where TBM had surfaced in discussion and saying that, for the first time, he felt TTUS was “ahead of the curve.” Other executives were encountering TBM, while he could respond from the perspective of an organization already practicing it. Mr. Halman remembered the reaction more colloquially: “I know about that. My CIO is already doing that.”
Mrs. Bagwell immediately placed an important boundary around the comparison. “We’re not ahead of other people on TBM,” she said, “but we’re ahead of our peers.”
The qualification makes the anecdote more useful. TTUS was not claiming leadership over organizations with mature TBM Practices, and the team remained candid about the capabilities it had not finished. The relevant comparison was the higher-education peer environment in which its executives operated. Less than a year earlier, TTUS had been learning basic implementation concepts with substantial vendor assistance. By August 2026, its CFO could encounter TBM externally from the perspective of an executive whose organization had already spent a year applying it, discovering its complications, and building recurring practices around it.
That change helps explain why the unfinished portions of the adoption should not dominate the case. TTUS still had substantial work ahead, but it was approaching that work with capabilities and experience it did not possess when implementation began. The organization was no longer determining whether TBM could produce useful information. It was deciding how far to extend it, which forms of precision justified continued effort, how standardized and local views should coexist, and which new management questions should be brought into the Practice.
TTUS’s experience occurred within a particular institutional structure, financial environment, platform choice, and organizational culture. It cannot establish a universal implementation sequence for other adopters. The case does, however, support several observations because they arise directly from conditions the organization encountered and the adaptations it made.
TTUS obtained meaningful value before every intended modeling layer and use case was complete. Budgeting, actuals analysis, contract management, and portions of standardized reporting became useful while service costing, labor allocation, Resource Towers, and showback continued to develop. By May, enough of the work had become recurring that Mr. Halman considered TBM an operational capability rather than simply an implementation project.
That experience does not imply that unfinished layers were unnecessary. TTUS’s later Resource Tower work demonstrates why such a conclusion would be misleading. The organization could obtain value before completing Towers, but it returned to the standardized resource view because it continued to see analytical value in the questions that view could answer.
The implication for other adopters is therefore narrower than “implement the easy things first” or “skip layers that delay value.” A more defensible lesson is to distinguish between what must exist for a particular use case now and what capabilities the organization expects to need later. That distinction can allow useful work to become operational without converting implementation sequence into a permanent decision about model scope.
The labor and service-catalog trajectory provides the clearest evidence. TTUS could create estimated labor allocations and begin with an existing service catalog, but neither structure was fully tested until employees were asked to report effort against the services and the resulting information was evaluated for service costing.
The April-to-May change in TTUS’s assessment is particularly instructive. The organization initially believed it had successfully and quickly implemented labor tracking because communication had worked and employees were participating. A month later, the team concluded that the resulting information was not adequate for its intended analytical purpose. Operational use revealed questions about classification, service definitions, integration, and target-state design that had not been resolved by the successful rollout itself.
TTUS responded by reconsidering both the service structure and the labor process. The implication is not that every adopter should rebuild a service catalog before beginning TBM or implement effort tracking at a particular point in the journey. It is that some requirements become visible only when an organization tries to use the model in a real operating process. Iteration can therefore represent organizational learning rather than simply correction of an implementation mistake.
TTUS repeatedly encountered opportunities to make the model more detailed. Better effort data could strengthen labor allocation. More granular consumption information could improve unit costs. Additional asset information could refine TCO. More elaborate allocation methods could distribute shared costs with greater specificity. Resource mapping could be extended deeper into the technical environment.
Every refinement also created work. Information had to be collected, understood, refreshed, governed, and explained. A model that can be built once during implementation may still be unsuitable for recurring operation if the organization cannot sustain the data and assumptions behind it.
By the summer, TTUS increasingly evaluated sophistication against the decision it was intended to improve. That did not mean approximate information was automatically acceptable. Trust remained essential, particularly when costs would eventually be shown to executives or service consumers. The emerging distinction was between trustworthy information and maximum possible granularity.
The case does not provide a formula for determining when a model is precise enough. It demonstrates why that question belongs in model design. The value of another allocation driver or data source depends partly on whether the additional information will change a decision enough to justify maintaining it.
TTUS repeatedly encountered information that was missing, inconsistent, or organized for a purpose different from the one TBM required. Vendor records did not always identify the manufacturer the team wanted to analyze. General-ledger categories did not contain enough context to explain every technology purchase. Employees did not always classify their work according to service definitions. Automated data loads could succeed technically while still requiring downstream manipulation.
The first response was often reconciliation inside or around the TBM environment. Over time, repeated cleanup encouraged TTUS to ask whether the source process should change instead. Procurement records could capture more useful information when transactions were created. Managers could become accountable for data quality in their areas. Service definitions could be changed when employee reporting repeatedly demonstrated that the existing categories did not describe the work.
The evidence does not establish that TTUS permanently solved every upstream problem or transformed enterprise data management. It does show a change in how the organization diagnosed recurring defects. An apparent TBM data-quality problem could be evidence that the process producing the data needed attention somewhere else.
For adopters, that distinction can prevent a TBM Practice from becoming a permanent downstream repair function. The model may need transformation and reconciliation logic, but recurring manual correction of the same source deficiency is itself information about the operating environment.
TTUS did not establish every organizational mechanism before beginning implementation. Procedures, playbooks, training, stakeholder participation, ownership, and internal expertise developed as the use cases created demand for them.
Budgeting required cost-center-owner participation and repeatable procedures. Contracts created new requirements for data ownership and recordkeeping. Labor allocation required communication with employees and managers. Service modeling required technical and operational knowledge beyond financial expertise. As the environment became more sophisticated, documentation and knowledge transfer became increasingly important to sustainability.
The organizational investment behind those mechanisms was also clearer by August 2026. The operating Practice depended on continuing organizational capacity rather than software alone.
By August 2026, those mechanisms remained uneven. TTUS had not established every governance routine it might eventually want, direct platform use remained concentrated, and advanced model development continued to benefit from vendor expertise. Yet the Practice had moved beyond dependence on one executive or one implementation activity. Multiple people could operate recurring processes, internal procedures existed, management participation was increasing, and the organization had enough experience for its executives to view TTUS as ahead of its higher-education peers in adopting TBM.
The lesson is not that adopters can ignore Program establishment until later. TTUS invested substantial effort in building the organizational mechanisms surrounding the model. Its experience instead demonstrates that Program development and use-case development can be interacting workstreams. Some of the requirements for an enduring Practice become clearest only when the organization begins operating the capabilities the Practice must sustain.
Taken together, these lessons describe an adoption that was less linear than an implementation plan might imply. TTUS established some capabilities relatively quickly, learned through attempting others, redirected effort when operational priorities intervened, and expanded its ambitions as new possibilities became visible. The value of the case is not in identifying one sequence another organization should reproduce. It is in showing how the experience of using TBM can change what an adopter understands about the capabilities it is trying to build.
By the summer of 2026, TTUS had moved well beyond the question of whether TBM could produce useful information. Budgeting and expected-versus-actual analysis had become recurring activities, contract information had developed into a significant management resource, and financial standardization had already reduced the effort required for at least one external benchmarking exercise. Mr. Halman identified expected-versus-actual spending and variance analysis among TTUS’s strongest outcomes, while Mrs. Bagwell highlighted contracts. The organization had also accumulated procedures, training, internal expertise, and management practices that made TBM increasingly part of how work was performed rather than something confined to an implementation project.
Other objectives remained active. Service costing and labor allocation had not reached the same operational state. Resource Tower mapping was still being worked through, and broad showback remained dependent on service costs TTUS was prepared to defend. At the same time, portfolio planning, project economics, and risk valuation were opening new directions for the Practice.
The coexistence of those states is central to the case. TTUS did not move through a predetermined sequence in which every model layer was completed before value appeared. Operating the capabilities it had built exposed requirements that were less visible at the outset. Labor tracking changed the team’s understanding of its service structure. Service costing raised questions about how much precision a decision justified. Resource modeling forced a clearer distinction between standardized technical categories and locally meaningful services. Recurring data problems redirected attention toward the processes that created the information in the first place.
The CFO’s experience at an external conference provides an appropriate measure of how the organization’s perspective had changed. When TBM surfaced among peers, he did not encounter it as a new discipline TTUS needed to investigate. He recognized something his organization was already doing. The episode captured both TTUS’s progress relative to its higher-education peers and the limits the team placed on that comparison. TTUS had not finished TBM, nor did it claim to have mastered every part of the discipline. It had accumulated enough experience to approach the remaining questions from inside an operating Practice rather than from outside one.
By August 2026, the TTUS story was still unfolding. The organization continued developing the capabilities it had not yet stabilized while considering new applications for the financial foundation already in place. The central question had shifted from whether TTUS could establish useful TBM capabilities to how those capabilities should continue to mature, how much sophistication each decision justified, and where the Practice should go next.
Red Hat built the world’s largest enterprise open-source software company, growing into a multi-billion-dollar firm before being acquired by IBM Corp. This open-source heritage often placed the value of technology in the product and engineering realm rather than with IT. Thus, not surprisingly, Red Hat’s TBM journey started with a new CFO wanting to know why IT costs were so high. Through the TBM framework and discipline, Red Hat IT successfully delivered cost transparency of all IT spend and then became a model for technology spend planning and forecasting. The IT team added the FinOps discipline to its capabilities and is now managing a broad hybrid cloud portfolio. However, TBM and FinOps have remained in the realm of IT only, until now. Red Hat’s current CIO, Jim Palermo, is driving TBM, FinOps, and Enterprise Agile Management across the company based on IT’s success and through the lens of value stream management. in this session, Jim will walk through Red Hat’s TBM journey and its current transformation to an operational business architecture framework built on value streams aligned to business outcomes.
When the team at Tenet Healthcare made the decision to move towards a model that provided more accurate financial transparency, they looked to TBM practices and solutions. Join Paola Arbour, EVP and CIO at Tenet healthcare as she answers the question “why TBM?”, including what Tenet was trying to solve with the TBM Taxonomy, the effectiveness of their KPIs, and how building support and momentum across the entire company was critical to their successful TBM adoption. In this session, Paola will also share how Tenet continues to evolve their use of TBM, including for mergers, acquisitions, and divestiture activity, as well as segmenting cost structures.
Data driven decision making has been a key to longevity and delivering best in class service to State Farm’s customers over the past 100 years. Recently, State Farm decided to use a managed services company for the day-to-day support of their Infrastructure Services. Today’s technology leaders need to be able to make real-time, informed decisions to help ensure technology investments are meeting their customer’s needs, while continuing to support company long-term goals. Ashley Pettit, SVP & CIO at State Farm, will be joined by Randy McBeath, Enterprise Technology Executive, and Andy Moore, Technology Director, and together they will share how TBM aided in State Farm’s analysis and decision to move to a managed service provider.
There is fast evolution occurring in the overall technology spend and value management market, with the advancements of cloud, Kubernetes, AI/ML, and other innovations. At the same time, we are seeing vast changes in the roles of the CIO, CFO, and business/digital leadership. In addition, TBM is intersecting with other disciplines and frameworks, such as Cloud FinOps, Agile engineering, and portfolio resource management. How is this affecting the TBM discipline, the TBM Council, and Apptio? For one, TBM is moving down market, becoming more accessible to all sizes and maturity of organizations, with easier ways to get started and a faster time to value. Cloud FinOps, meanwhile, is advancing and adding capabilities previously in TBM to the cloud cost management space. Join Apptio CEO Sunny Gupta as he explores the evolving TBM landscape and how he believes it will bring even greater opportunity and value to organizations worldwide.
In today’s challenging economic times it is critical that CFOs, CIOs, and CTOs speak the same language when it comes to the value of technology spend. Having a single source of truth that everyone can feel confident in, track progress continuously throughout the year with shared insights, and analyzing options for resourcing and funding in order to reduce waste is where TBM deepens their partnership. In this discussion, join members of the TBM Council Board of Directors as they discuss the pivotal conversations and steps taken to collectively adopt TBM practices across the organization, including responding to naysayers and gaining allies.
Fumbi Chima has led technology teams across multiple organizations throughout her esteemed career, including retail, manufacturing, media, and financial services. As a turnaround and high growth leader, Fumbi has leveraged TBM as a foundational practice to bring repeatable processes, purchasing guidelines, and cost/resource savings. Now at Boeing Employe Credit Union (BECU) serving more than 1.2 million members, Fumbi is driving their digital transformation with a clear vision and strategy to optimize their public-cloud with TBM and Cloud-FinOps, adopt a product model, and set the groundwork for future innovation and growth. Join Fumbi and Larry Blasko, President, Field Operations at Apptio, as they discuss the lessons Fumbi has learned along her TBM journey, and where this transformation leader sees the evolution of TBM taking the Technology industry.
Technology leaders have a unique opportunity to transform their organizations into environmental champions with sustainable business practices. In this session, Neal Ramasamy, CIO at Cognizant and Phil Alfano, Field CTO at Apptio will share how TBM can be leveraged to achieve comprehensive visibility into real-time data-driven tracking to ensure company goals and actions are being met to achieve a sustainable future.
For McGraw Hill, having a transparent framework that drives smart investment strategies and a common language across this 135-year-old company is critical. Known as one of the “big three” education publishers, McGraw Hill must stay ahead of their competitors with innovation and value delivery. Join Yuliya Oberman, Finance Director for McGraw Hill Education and Eileen Wade, General Manager of the TBM Council as they discuss how TBM is essential to McGraw Hill’s enterprise resource strategies and digital transformation journey.
In this fireside chat, Matt Yanchyshyn, GM, AWS Marketplace & Partner Engineer at AWS will join incoming General Manager of the TBM Council, Jack Bischof, for a discussion on best practices for building successful TBM practices focused on cloud financial management. Including a deep dive into the nuances, learnings, and milestones that the world’s 9th largest insurance company is achieving on their Cloud FinOps journey.
Hear from Ajay Patel, COO at Apptio and Zubin Irani, CEO at Cprime as they discuss how the intersection of TBM and enterprise agile planning is a critical strategy for organizations to adopt if they want to drive business growth more efficiently, in real-time, and keep up with the speed of change that today’s organizations face.
Join Origin Energy’s Adrian Thivy, GM, Enterprise Technology Services, as he shares how TBM is creating complete confidence in their spend-to-value ratios across IT and the broader company, allowing a rapid response to the market forces driving significant pressure on the “cost to serve” customers. A finalist for the 2022 TBM Council Award for TBM Pacesetter, hear how their TBM practice was built in record time, including lessons learned as they developed business capabilities and managed a significant cloud migration and transformation.
Session topics will include:
Presented by:
Many organizations aspire for a cloud-native posture, however few have the time, resources and budget to transform into 100% public cloud operations. Equifax has broken through those barriers to modernize its infrastructure globally — driving faster innovation for customers, more business agility, and stronger cybersecurity. Hear from Manav Doshi, GM, Technology Solutions on how the Equifax team is rebuilding a century-old company, with a real-time approach to optimizing cost and revenue growth in the cloud.
Presented by:
Transport for NSW is the winner of the 2022 TBM Council Award for TBM Pacesetter, which recognizes significant progress and value with TBM in a relatively short period of time. In this session, hear how the merger of Roads and Maritime Services (RMS) and Transport for New South Wales resulted in the fastest consolidation of TBM data, models, and reports into a single TBM practice. Hear from Poonam Kataria, Sr. Manager of TBM, as she shares how TBM is driving Transport’s three key strategic outcomes: connecting a customer’s whole life; successful places for communities; and enabling economic activity.
Session topics will include:
Presented by:
Discuss how TBM supports visibility of investments across the enterprise to support setting best practices and standards for managing the impact of environmental, societal, and governance strategies by IT departments and organizations.
The TBM Council Standards Committee has built out TBM integration models with other IT disciplines, including Enterprise Agile and Product Thinking, as well as ServiceNow CSDM. Current findings will be shared to drive group discussion, experience, and feedback.
Public cloud strategies are often embraced for the promise of rapid scalability, on-demand agility, and best-in-class security, resiliency, and features. However, public cloud adoption presents significant financial challenges that, when not addressed, inhibit any firm’s ability to exploit the promises of public cloud.
To address these challenges, customers need to simultaneously resolve current inefficiencies and build capability to ensure avoidance of waste in the long term.
In this session we discuss a detailed framework combining TBM-Cloud with FinOps, allowing customers to understand how to implement a program to overcome these challenges and financially succeed in the cloud.
Session discussion topics include:
Presented by:
A look back at 10 years of TBM leadership and community building.
Introduced more than 10 years ago, Technology Business Management (TBM) was born out of the need for CIOs to have a management system to drive their technology operating strategy. At its core, the TBM discipline gives visibility into technology spend to provide common ground and enable a collaborative partnership across teams for prioritizing resources and achieving business outcomes. In this session, the TBM Council Standards Committee Chair, Atticus Tyson will share how over the past few years TBM has evolved to ensure leaders are able to accelerate digital initiatives, embrace the cloud, and communicate today’s complex technology landscape. TBM enables organizations to frequently and quickly evaluate projects, platforms, and investments to address the needs of the modern enterprise.
Atticus Tyson and Phil Alfano will guide the group through an executive discussion to capture “What is digital success to you?”. Is it how your organization creates new business capabilities? The elimination of legacy processes and systems? Funding innovation? Or all of the above as long as it drives an improved customer experience? Discuss with your table mates, as an overall group, and capture learnings and takeaways to bring back to your own team.
How does a 170-year-old financial institution deliver a new, fully modernized technology strategy while supporting 24×7 service to their customers across a multitude of platforms, including point-of-sale, mobile, and web services? Mike Brady, Nicole Holmes, and Chad Schmidt will share how at Wells Fargo, they are creating a Technology Infrastructure team founded in the TBM discipline and responsible for aligning with internal partners to adopt an automation first approach for accelerating the delivery of services and deploying enhancements at speed. All while remaining compliant, secure, and agile.
It’s been two years since the World Health Organization declared Covid-19 a global pandemic. To re-imagine employee and customer experiences, every company was forced to speed up their shift to digital from multi-year project plans to instead creating, executing, and delivering new business models in a matter of weeks. As we emerge from this crisis, we recognize this shift is not slowing down but exponentially increasing as businesses continue to respond to societal expectations of anytime, anywhere. In this session, Sunny Gupta will share how the companies best positioned to quickly respond to changing market conditions and hyper competition have a holistic view of their technology spend so they can be agile in their investment decisions, use the cloud as a competitive advantage, and align their resources to product delivery models and continuously measure value.
Spinning up a cloud-native posture is a desired strategy for many organizations, however few have the time, resources, and budget to achieve 100% public cloud operations. In 2018, Equifax set a 5-year goal to achieve this, striving to provide their customers with faster innovation, more flexible business agility, and stronger cybersecurity. Hear from RJ Hazra, SVP & CFO, Technology on the lessons and successes the Equifax team has found along their journey, and what remains as they cross into their final year of their company-wide digital transformation.
The cloud is a significant shift in computing and companies need to get maximum value from it. FinOps is the evolving cloud financial management practice that empowers organizations to track and maximize cloud spend and enable tech, finance, and business teams to collaborate on data-driven spending decisions. In this talk, J.R. Storment, Executive Director of the FinOps Foundation will explore the intersection between TBM and the FinOps practice and the benefits achieved. Session discussion topics include:
In this engaging conversation, executive leaders will share both the challenges and best practices realized on their journey to embrace product-based innovation.
Session discussion topics include:
Session abstract coming soon
TBM empowers hundreds of decision makers with the facts they need to execute a digital strategy faster, without bias, and in alignment across business units. This includes technology consumers, service and application owners, LOB CIOs, enterprise PMOs, compliance leaders, budget coordinators, and many more. What are the fundamentals of developing and executing a successful TBM practice? In this session, experienced practitioners will share the lessons and foundations they’ve learned delivering business value for their organizations with TBM.
Session discussion topics include: